groundranger
Historic · latest filing May 2024Residential

7108 Running Rope

Austin, TX 78731

7108 Running Rope: 1 project on record

City of Austin lists 1 filing across 1 project at 7108 Running Rope, Austin, TX 78731. The most recent, filed May 2, 2024, covers: “5ft tunnel sewer line repair under foundation of home. access toilet using pvc”.

Compiled from City of Austin records · updated May 2, 2024

Projects
1
1 filings
Latest filing
May 2, 2024
since May 2, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

5ft tunnel sewer line repair under foundation of home. access toilet using pvc

  1. AppliedMay 2, 2024
  2. IssuedMay 2, 2024
  3. WorkMay '24 – May '24
  4. Final inspectionMay 17, 2024

Passed final inspection May 17, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. 5ft tunnel sewer line repair under foundation of home. access toilet using pvc

    5ft tunnel sewer line repair under foundation of home. access toilet using pvc

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7108 Running Rope

What is being built at 7108 Running Rope?

The latest filing (City of Austin permit 2024-055018 PP, May 2, 2024) covers 5ft tunnel sewer line repair under foundation of home. access toilet using pvc.

How many permits and filings does 7108 Running Rope have?

1 filing across 1 project, from May 2, 2024 to May 2, 2024.

Is there other construction near 7108 Running Rope?

Yes. Nearby filings include 7110 Running Rope (our scope of work includes performing a direct-access drain repair beneath the master bathroom shower. to gain access to the damaged drain piping we will carefully demolish the existing shower tile and shower pan. once the shower pan has been removed we will saw-cut and remove approximately a 2 x 2 section of the concrete slab directly over the shower drain to expose the broken p-trap. after the damaged piping has been exposed we will remove the existing broken p-trap and install a new pvc p-trap using approved primer and solvent cement. once the repair is complete we will restore water flow to the shower and perform an operational leak test by running water through the drain to verify the new fitting is watertight and functioning properly. this estimate includes only the plumbing work necessary to expose remove and replace the defective p-trap and verify the repair is leak-free. this estimate does not include replacing or patching the concrete slab after the repair is completed. additionally this estimate does not include the installation of a new shower pan waterproofing tile installation grout or any other finish carpentry or restoration work. the homeowner will be responsible for all shower pan replacement and tile restoration by others following completion of the plumbing repair. should any unforeseen conditions or additional concealed damage be discovered after the concrete is opened any additional repairs required will be discussed with the homeowner and approved prior to proceeding. **need to add a natural gas tankless water heater replacement, Sep 29, 2026); 7111 Mesa Dr (replacement of an existing water heater replace tankless water heater, Feb 4, 2025); 7107 Mesa Dr (base: installing a backup battery system and additional meter socket, Sep 22, 2026).

How do I get alerts for new permits at 7108 Running Rope?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78731
Email me when a new permit is filed