7505 Stonecliff Cir
Austin, TX 78731
Water line replacement permitted at 7505 Stonecliff Cir
A full water line replacement from the meter to the house, described as up to 60 feet, was permitted at 7505 Stonecliff Cir on October 20, 2026. The City of Austin lists the plumbing permit, 2026-134084 PP, as active.
Summarized from City of Austin records · updated Oct 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 20, 2026
- since Oct 20, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayFull water line replacement up to 60 from meter to house
- AppliedOct 12, 2026
- IssuedOct 20, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectFull water line replacement up to 60 from meter to house
Full water line replacement up to 60 from meter to house
City of Austin permitPlumbing PermitActive- Record
- 2026-134084 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7505 Stonecliff Cir
What work is planned at 7505 Stonecliff Cir?
A City of Austin plumbing permit describes a full water line replacement from the meter to the house, up to 60 feet.
When was the water line replacement permitted?
The permit was filed on October 20, 2026.
What is the permit number for 7505 Stonecliff Cir?
The City of Austin permit number is 2026-134084 PP.
Is the plumbing permit for 7505 Stonecliff Cir active?
Yes. The City of Austin lists permit 2026-134084 PP as active.
Is a new building planned at 7505 Stonecliff Cir?
The available permit describes water line replacement from the meter to the house, not construction of a new building.
Also being built nearby
All of 78731- 7507 Stonecliff CirAug 28, 2026Base: installing a backup battery system and additional meter socket · 35 m away
- 3800 Greystone DrMay 27, 2025Replacement of an existing water heater install like/like water heater · 41 m away
- 3710 Greystone DrMay 14, 2024Install level 2 ev charger per austin energys plug-in rebate guidelines · 58 m away
- 7508 Stonecliff CirJan 19, 2025Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 7511 Stonecliff DrJul 15, 2024New pool · 76 m away
- 3806 Greystone DrMar 16, 2026Full interior renovation of existing single-family home with structural changes. replacement of all fixtures and finishes · 80 m away
- 3708 Greystone DrMay 16, 2024New outdoor pergola with outdoor kitchen · 87 m away
- 3711 Greystone DrFeb 26, 2026We will install a new pool gas line from the meter to the back yard property 55ft long · 102 m away
- 7515 Stonecliff DrJan 24, 2024Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 3706 Greystone DrJul 2, 2026Replace water line between water meter and manifold behind water heater due to major leak under driveway and substandard material · 117 m away
- 3807 Greystone DrApr 9, 2024Replacement of complete existing central heat and air system with or without duct work · 120 m away
- 7517 Stonecliff DrSep 18, 2026Base: installing a backup battery system and additional meter socket · 120 m away