7506 Valley Dale Dr
Austin, TX 78731
7506 Valley Dale Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 7506 Valley Dale Dr, Austin, TX 78731 since September 9, 2024. The most recent, filed November 6, 2024, covers: “Carport conversion into enclosed garage”.
Compiled from City of Austin records · updated Nov 6, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Nov 6, 2024
- since Sep 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCarport conversion into enclosed garage
- AppliedApr 17, 2024
- IssuedNov 6, 2024
- WorkNov '24 – Dec '24
- Final inspectionDec 20, 2024
Passed final inspection Dec 20, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsCarport conversion into enclosed garage
Carport conversion into enclosed garage
City of Austin permitElectrical PermitFinal- Record
- 2024-095998 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Carport conversion into enclosed garage
Carport conversion into enclosed garage
City of Austin permitBuilding PermitFinal- Record
- 2024-095998 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7506 Valley Dale Dr
What is being built at 7506 Valley Dale Dr?
The latest filing (City of Austin permit 2024-095998 EP, November 6, 2024) covers carport conversion into enclosed garage.
How many permits and filings does 7506 Valley Dale Dr have?
2 filings across 2 projects, from September 9, 2024 to November 6, 2024.
Is there other construction near 7506 Valley Dale Dr?
Yes. Nearby filings include 7511 Step Down Cv (addition of a wood deck and pergola to rear of existing 2-story sfr, Aug 29, 2024); 7509 Step Down Cv (replacement of complete existing central heat and air system with or without duct work attic access in closet, Mar 12, 2026); 7503 Valley Dale Dr (interior remodel interior remodel of a portion of the first floor only including layout changes to the primary bedroom and bathroom. plumbing hvac and electrical layout and modificatons, Mar 17, 2025).
How do I get alerts for new permits at 7506 Valley Dale Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 7511 Step Down CvAug 29, 2024Addition of a wood deck and pergola to rear of existing 2-story sfr · 52 m away
- 7509 Step Down CvMar 12, 2026Replacement of complete existing central heat and air system with or without duct work attic access in closet · 52 m away
- 7503 Valley Dale DrMar 17, 2025Interior remodel interior remodel of a portion of the first floor only including layout changes to the primary bedroom and bathroom. plumbing hvac and electrical layout and modificatons · 56 m away
- 7601 Valley Dale DrDec 30, 2024Disconnect/reconnect power to tie in pv/ess components and install a tesla socket mounted backup switch that is rated up to 200amp. we are not upgrading the size of the service not upgrading the meter size · 60 m away
- 7603 Valley Dale DrApr 27, 2026Addition of an electrical panel and outlets in the garage · 86 m away
- 7512 Step Down CvNov 10, 2026Proposed construction of a detached pool deck and associated steps consisting of ipe decking over steel framing with code-compliant handrails/guards where required connecting the existing pool to the existing pool patio flatwork. existing pool permitted and constructed by others · 108 m away
- 7605 Valley Dale DrSep 3, 2026Amended plat of lots 5 & 6, block e, vista west-ii · 111 m away
- 7503 Step Down CvMar 30, 2026Replacement of complete existing central heat and air system with or without duct work · 113 m away
- 7504 Long Point DrMar 2, 2026New main 3/4 waterline tap to house · 113 m away
- 7506 Step Down CvSep 23, 2026Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork · 125 m away
- 7601 Parkview CirSep 10, 2026Base: installing a backup battery system and additional meter socket · 142 m away
- 7603 Parkview CirNov 17, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton two stage horizontal gas system · 144 m away