7522 Stonecliff Dr

Austin, TX 78731

Rooftop solar and electrical upgrades at 7522 Stonecliff Dr

Austin permits show a 6.44 kW rooftop solar system and 20.0 kWh energy storage system were permitted for an existing residence at 7522 Stonecliff Dr on October 7, 2025. A later permit, filed November 21, 2025, covers replacing the utility meter with a 200-amp meter and replacing the electrical panel. Both permits are listed as final.

Summarized from City of Austin records · updated Nov 21, 2025

Projects
2
2 filings
Latest filing
Nov 21, 2025
since Oct 7, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replace utility meter with 200a and replace panel

  1. AppliedNov 18, 2025
  2. IssuedNov 21, 2025
  3. WorkNov '25 – Dec '25
  4. Final inspectionDec 18, 2025

Passed final inspection Dec 18, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replace utility meter with 200a and replace panel

    Replace utility meter with 200a and replace panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install new 6.44 kw dc rooftop solar system and 20.0 kwh energy storage system to existing residential

    Install new 6.44 kw dc rooftop solar system and 20.0 kwh energy storage system to existing residential

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7522 Stonecliff Dr

What is being built at 7522 Stonecliff Dr?

Austin permits indicate a rooftop solar system with energy storage was installed at the existing residence. The records also cover a utility meter and electrical panel replacement.

Is a new house being built at 7522 Stonecliff Dr?

The permit record describes the solar and storage system as being installed at an existing residence. It does not describe construction of a new home.

When was the solar system at 7522 Stonecliff Dr permitted?

The solar and storage system permit, 2025-126675 EP, was filed on October 7, 2025, and is listed as final.

What electrical work is permitted at 7522 Stonecliff Dr?

Permit 2025-148412 EP covers replacing the utility meter with a 200-amp meter and replacing the electrical panel. It was filed on November 21, 2025, and is listed as final.

How large is the solar system at 7522 Stonecliff Dr?

The permit describes a 6.44 kW DC rooftop solar system and a 20.0 kWh energy storage system.