7705 Ridgestone Dr
Austin, TX 78731
7705 Ridgestone Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 7705 Ridgestone Dr, Austin, TX 78731. The most recent, filed November 14, 2024, covers: “Replace 200 amp meter and panel”.
Compiled from City of Austin records · updated Nov 14, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 14, 2024
- since Nov 14, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplace 200 amp meter and panel
- AppliedNov 1, 2024
- IssuedNov 14, 2024
- !WorkNov '24 – Nov '25
- Final inspection
Marked expired Nov 30, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace 200 amp meter and panel
Replace 200 amp meter and panel
City of Austin permitElectrical PermitExpired- Record
- 2024-146616 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7705 Ridgestone Dr
What is being built at 7705 Ridgestone Dr?
The latest filing (City of Austin permit 2024-146616 EP, November 14, 2024) covers replace 200 amp meter and panel.
How many permits and filings does 7705 Ridgestone Dr have?
1 filing across 1 project, from November 14, 2024 to November 14, 2024.
Is there other construction near 7705 Ridgestone Dr?
Yes. Nearby filings include 7702 Chimney Corners (replace 200a underground service, Sep 28, 2026); 7800 Chimney Corners (express: tub to shower replacement (prefab base) in the same location without relocating plumbing, Mar 16, 2026); 3900 Pebble Path (eplan: residential expedited review - new construction of a 2-story single-family res. [4bed 5bath] with attached garage, Dec 16, 2025).
How do I get alerts for new permits at 7705 Ridgestone Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 7702 Chimney CornersSep 28, 2026Replace 200a underground service · 43 m away
- 7800 Chimney CornersMar 16, 2026Express: tub to shower replacement (prefab base) in the same location without relocating plumbing · 45 m away
- 3900 Pebble PathDec 16, 2025Eplan: residential expedited review - new construction of a 2-story single-family res. [4bed 5bath] with attached garage · 54 m away
- 3901 Petra PathFeb 20, 2026Gas line for generator installation · 57 m away
- 7801 Ridgestone DrJan 13, 2026Replacement of complete existing central heat and air system with or without duct work · 85 m away
- 3903 Petra PathMay 8, 2024Tunneling under home to replace 30 foot of drain pipe. also replacing 20 foot of main yard sewer line · 91 m away
- 3900 Petra PathAug 26, 2025Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 7700 Pleasant Meadow CirMay 15, 2024Express: replace windows and doors like for like · 112 m away
- 3902 Petra PathJun 16, 2025Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 3810 N Green TrailsSep 1, 2026Replacement of complete existing central heat and air system with or without duct work · 128 m away
- 7702 Pleasant Meadow CirAug 22, 2026Express: cosmetic remodel- paint tile wood flooring swapped out light fixtures cabinets · 131 m away
- 3902 Sidehill PathNov 7, 2024Repair breaker box · 141 m away