groundranger
Active · latest filing Sep 2026Residential

7805 Harvestman Cv

Austin, TX 78731

Austin home gets backup battery and HVAC upgrades

Permits indicate electrical and heating-and-cooling upgrades at this Austin home, rather than a new building. The HVAC replacement permit was filed April 30, 2025, and a permit for a backup battery system and additional meter socket was filed September 18, 2026. Both permits are listed as final.

Summarized from City of Austin records · updated Sep 18, 2026

Projects
2
2 filings
Latest filing
Sep 18, 2026
since Apr 30, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Base: installing a backup battery system and additional meter socket

  1. AppliedAug 31, 2026
  2. IssuedSep 18, 2026
  3. WorkSep '26 – Oct '26
  4. Final inspectionOct 21, 2026

Passed final inspection Oct 21, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work 3 ton gas furnace with heat pump hybrid friedrich breeze

    Replacement of complete existing central heat and air system with or without duct work 3 ton gas furnace with heat pump hybrid friedrich breeze

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7805 Harvestman Cv

What is being built at 7805 Harvestman Cv?

City of Austin permits indicate a backup battery system and additional meter socket, along with replacement of the home’s central heating and air system. The records do not describe new home construction.

Is a backup battery system being installed at 7805 Harvestman Cv?

Yes. Permit 2026-114338 EP, filed September 18, 2026, covers installing a backup battery system and an additional meter socket. It is listed as final.

Is the HVAC system being replaced at 7805 Harvestman Cv?

Yes. Mechanical permit 2025-052624 MP, filed April 30, 2025, covers replacing the existing central heat and air system with a 3-ton gas furnace and heat pump hybrid. It is listed as final.

When were permits filed for work at 7805 Harvestman Cv?

The mechanical permit was filed April 30, 2025. The electrical permit for a backup battery system and additional meter socket was filed September 18, 2026.

What is permit 2026-114338 EP for in Austin?

The City of Austin electrical permit covers installing a backup battery system and additional meter socket at 7805 Harvestman Cv. It was filed September 18, 2026, and is listed as final.

What is permit 2025-052624 MP for?

The mechanical permit covers replacement of the existing central heating and air system at 7805 Harvestman Cv. It was filed April 30, 2025, and is listed as final.

Also being built nearby

All of 78731
Email me when a new permit is filed