7959 Mesa Trails Cir
Austin, TX 78731
7959 Mesa Trails Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 7959 Mesa Trails Cir, Austin, TX 78731. The most recent, filed July 18, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jul 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 18, 2025
- since Jul 18, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJul 17, 2025
- IssuedJul 18, 2025
- WorkJul '25 – Nov '25
- Final inspectionNov 13, 2025
Passed final inspection Nov 13, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-089420 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7959 Mesa Trails Cir
What is being built at 7959 Mesa Trails Cir?
The latest filing (City of Austin permit 2025-089420 MP, July 18, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 7959 Mesa Trails Cir have?
1 filing across 1 project, from July 18, 2025 to July 18, 2025.
Is there other construction near 7959 Mesa Trails Cir?
Yes. Nearby filings include 7949 Mesa Trails Cir (replacement of complete existing central heat and air system with or without duct work, May 14, 2024); 7950 Mesa Trails Cir (request to disconnect installing a 24/21 kw generator and a 100 amp transfer switch for the whole house. the ocp is 100 amp & the total calc load is 20235 va (84 amp) 20.2 kw also running a 4 wire from the transfer switch to the main panel. need 2 ground rods at the service. installing sure start on the ac unit & whole home surge protector, Aug 7, 2025); 7936 Mesa Trails Cir (water pressure regulator valve was repaired in the yard, Jun 25, 2025).
How do I get alerts for new permits at 7959 Mesa Trails Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 7949 Mesa Trails CirMay 14, 2024Replacement of complete existing central heat and air system with or without duct work · 25 m away
- 7950 Mesa Trails CirAug 7, 2025Request to disconnect installing a 24/21 kw generator and a 100 amp transfer switch for the whole house. the ocp is 100 amp & the total calc load is 20235 va (84 amp) 20.2 kw also running a 4 wire from the transfer switch to the main panel. need 2 ground rods at the service. installing sure start on the ac unit & whole home surge protector · 50 m away
- 7936 Mesa Trails CirJun 25, 2025Water pressure regulator valve was repaired in the yard · 70 m away
- 7910 Mesa Trails CirMar 14, 2024Express: window replacement (like for like) · 80 m away
- 7971 Mesa Trails CirOct 18, 2026Gas pipe installation for home generator · 86 m away
- 7973 Mesa Trails CirMay 28, 2025Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 8001 Mesa DrSep 6, 2024Gas leak in the 2 inch line feeding gas from the meter to the shcool. to replace this section of old line will be pulled up and the new line will be put back in its place · 119 m away
- 7937 Mesa Trails CirFeb 4, 2026Replacement of complete existing central heat and air system with or without duct work downstairs system only · 121 m away
- 7924 Comfort CvMar 2, 2007Mesa forest p.u.d., swimming pool & cabana · 122 m away
- 7920 Comfort CvNov 7, 2025Replacement of an existing water heater alicia dies - replace tank type gas water heater like for like · 131 m away
- 7923 Mesa Trails CirMar 21, 2024Expedited review - 1-story addition and remodel to existing 2-story single family home · 131 m away
- 7905 Mesa Trails CirJul 18, 2025Upgrade of 125amp underground to new 200amp · 135 m away