12302 Moriah Bnd
Austin, TX 78732
Rooftop solar and batteries planned at 12302 Moriah Bnd
City of Austin permits filed July 25, 2025, indicate rooftop solar panels and batteries are planned for the residence at 12302 Moriah Bnd. A second electrical permit covers work for an Enphase 4.0 meter can with an IQ meter base.
Summarized from City of Austin records · updated Jul 25, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 25, 2025
- since Jul 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRoof top solar and batteries
- AppliedJul 7, 2025
- IssuedJul 25, 2025
- WorkJul '25 – Apr '26
- Final inspectionDec 2, 2025
Passed final inspection Dec 2, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsRoof top solar and batteries
Roof top solar and batteries
City of Austin permitElectrical PermitFinal- Record
- 2025-083705 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Electrical shutdown required for installation of enphase 4.0 meter can with iq meter base
Electrical shutdown required for installation of enphase 4.0 meter can with iq meter base
City of Austin permitElectrical PermitFinal- Record
- 2025-083715 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12302 Moriah Bnd
What is being built at 12302 Moriah Bnd?
City of Austin permit records indicate rooftop solar panels and batteries are planned at the residence. The permits were filed July 25, 2025.
Is solar being installed at 12302 Moriah Bnd in Austin?
Yes. Permit 2025-083705 EP describes rooftop solar and batteries. Its status is listed as Final.
When was the solar permit filed for 12302 Moriah Bnd?
The City of Austin record for permit 2025-083705 EP is dated July 25, 2025.
Are batteries included in the solar project at 12302 Moriah Bnd?
Yes. The description for City of Austin permit 2025-083705 EP says “Roof top solar and batteries.”
What electrical work is planned at 12302 Moriah Bnd?
Permit 2025-083715 EP describes an electrical shutdown required for installation of an Enphase 4.0 meter can with an IQ meter base. The permit is dated July 25, 2025.