717 Morning Moon Cir
Austin, TX 78732
717 Morning Moon Cir: 2 projects on record
City of Austin lists 2 filings across 2 projects at 717 Morning Moon Cir, Austin, TX 78732 since November 15, 2024. The most recent, filed December 12, 2024, covers: “Install new gas line for generator”.
Compiled from City of Austin records · updated Dec 12, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Dec 12, 2024
- since Nov 15, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new gas line for generator
- AppliedDec 3, 2024
- IssuedDec 12, 2024
- WorkDec '24 – Dec '24
- Final inspectionDec 18, 2024
Passed final inspection Dec 18, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall new gas line for generator
Install new gas line for generator
City of Austin permitPlumbing PermitFinal- Record
- 2024-158446 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect 14kw whole home generator (natural gas) and 200amp transfer switch connected to house meter and main panel.(hahn norden)
Request to disconnect 14kw whole home generator (natural gas) and 200amp transfer switch connected to house meter and main panel.(hahn norden)
City of Austin permitElectrical PermitFinal- Record
- 2024-149727 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 717 Morning Moon Cir
What is being built at 717 Morning Moon Cir?
The latest filing (City of Austin permit 2024-158446 PP, December 12, 2024) covers install new gas line for generator.
How many permits and filings does 717 Morning Moon Cir have?
2 filings across 2 projects, from November 15, 2024 to December 12, 2024.
Is there other construction near 717 Morning Moon Cir?
Yes. Nearby filings include 709 Morning Moon Cir (replacement of complete existing central heat and air system with or without duct work like for like 2.5 ton horizontal gas, Oct 6, 2026); 1732 Morning Moon Cir (replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace old system with new 2 ton single stage goodman system, May 7, 2025); 1601 Morning Moon Cir (install level 2 ev charger, Feb 3, 2025).
How do I get alerts for new permits at 717 Morning Moon Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78732- 709 Morning Moon CirOct 6, 2026Replacement of complete existing central heat and air system with or without duct work like for like 2.5 ton horizontal gas · 27 m away
- 1732 Morning Moon CirMay 7, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace old system with new 2 ton single stage goodman system · 122 m away
- 1601 Morning Moon CirFeb 3, 2025Install level 2 ev charger · 159 m away
- 12517 Evening Star PassMar 13, 2024Ev charger install within residence · 186 m away
- 908 Morning Moon CirAug 4, 2025Excavate in yard and tunnel under slab to expose and repair 5 of drain lines · 200 m away
- 1529 Morning Moon CirSep 30, 2025New pool & spa with concrete deck · 210 m away
- 815 S Quinlan Park RdNov 2, 2026New construction single-family residential 2-story 5 bedroom 6.5 bath with attached 3-car garage covered front entry rear covered patios outdoor living room and 3-car garage attached by breezeway · 210 m away
- 632 Quinlan Park RdJan 21, 2022632 south quinlan park road boatdock and bulkhead · 228 m away
- 12501 Evening Star PassApr 25, 2024New 121 sq ft in-ground swimming pool and 1236sqft of concrete decking · 236 m away
- 1513 Morning Moon CirJan 8, 2024Swapping out 2 40-gallon water heaters for 1 tankless water heater · 266 m away
- 1000 Morning Moon CirNov 9, 2026New pool/spa with concrete deck and required enclosure (heater or autofill) · 275 m away
- 12426 Evening Star PassJan 5, 2026New inground swimming pool and spa with reqd enclosure device for existing 1-story single family residence · 279 m away