10027 Circleview Dr
Austin, TX 78733
Electrical panel and meter base replacement in Austin
An electrical permit covers replacement of the 200-amp main breaker panel and meter base at 10027 Circleview Dr. The City of Austin record was filed on August 7, 2026, and lists the permit as final.
Summarized from City of Austin records · updated Aug 7, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 7, 2026
- since Aug 7, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of 200a mb panel and meter base
Replacement of 200a mb panel and meter base
City of Austin permitElectrical PermitFinal- Record
- 2026-101317 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10027 Circleview Dr
What is being built at 10027 Circleview Dr?
The City of Austin permit covers replacing the 200-amp main breaker panel and meter base. It is listed as an electrical permit.
When was the permit for 10027 Circleview Dr filed?
The permit was filed on August 7, 2026.
What does Austin permit 2026-101317 EP cover?
Permit 2026-101317 EP covers replacement of the 200-amp main breaker panel and meter base.
What is the status of the electrical permit at 10027 Circleview Dr?
The City of Austin lists permit 2026-101317 EP as final.
Is a solar installation planned at 10027 Circleview Dr?
The listed permit describes replacement of a main breaker panel and meter base; it does not describe a solar installation.
Also being built nearby
All of 78733- 10037 Circleview DrApr 18, 2024Install 13.5 energy storage system for existing residential only · 115 m away
- 10012 Circleview DrSep 10, 2026Solar system addition · 212 m away
- 10072 Circleview DrSep 29, 2025Panel upgrade · 242 m away
- 10070 Circleview DrOct 7, 200810070 circleview drxxxxx · 260 m away
- 10092 Circleview DrFeb 26, 2024*request to disconnect* need to pull meter to replace mdp. underground service meter can does not need to be replaced. new main breaker to be 200a · 268 m away
- 2419 Dominion HillNov 12, 2025Install new 21.250 kw rooftop solar system and 13.5 kw energy storage system for existing residential only · 404 m away
- 2302 Cliffs Edge DrFeb 3, 2025Replace existing panel & meter socket like for like · 469 m away
- 2709 Barton Point DrNov 2, 2026Etj - upgrade underground service. service is 200 amp but need to be replace because main panel is old and corroded · 475 m away
- 2113 Cliffs Edge DrSep 26, 2025Request to disconnect existing 200a service to install a 200a tesla gateway with 200a main breaker. no change to the meter ca · 568 m away