1014 Lisa Dr
Austin, TX 78733
1014 Lisa Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1014 Lisa Dr, Austin, TX 78733. The most recent, filed September 25, 2025, covers: “New service for sfr in etj”.
Compiled from City of Austin records · updated Sep 25, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 25, 2025
- since Sep 25, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNew service for sfr in etj
- AppliedSep 22, 2025
- IssuedSep 25, 2025
- WorkSep '25 – Mar '26
- Final inspectionMar 31, 2026
Passed final inspection Mar 31, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectNew service for sfr in etj
New service for sfr in etj
City of Austin permitElectrical PermitFinal- Record
- 2025-120375 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1014 Lisa Dr
What is being built at 1014 Lisa Dr?
The latest filing (City of Austin permit 2025-120375 EP, September 25, 2025) covers new service for sfr in etj.
How many permits and filings does 1014 Lisa Dr have?
1 filing across 1 project, from September 25, 2025 to September 25, 2025.
Is there other construction near 1014 Lisa Dr?
Yes. Nearby filings include 10221 Jennys Jump Dr (install 54 (410w) roof mounted solar panels 22.140 kw solar service system tying into existing 200 amp rated msp, Jul 18, 2024); 1103 Carlotta Ln (installing existing panels (8.75 kw dc) from a previous installation on the rooftop of the existing residential home. in addition installing a new 11.5 kw ac inverter integrated with energy storage of 13.5 kw. the previous inverter installed is unknown, Jun 11, 2026); 1201 Carlotta Ln (rio robles sec 1-a — rio robles section one-a, Sep 28, 2007).
How do I get alerts for new permits at 1014 Lisa Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78733- 10221 Jennys Jump DrJul 18, 2024Install 54 (410w) roof mounted solar panels 22.140 kw solar service system tying into existing 200 amp rated msp · 193 m away
- 1103 Carlotta LnJun 11, 2026Installing existing panels (8.75 kw dc) from a previous installation on the rooftop of the existing residential home. in addition installing a new 11.5 kw ac inverter integrated with energy storage of 13.5 kw. the previous inverter installed is unknown · 255 m away
- 1201 Carlotta LnSep 28, 2007Rio robles sec 1-a — rio robles section one-a · 269 m away
- 804 Chrissys CvMar 10, 2024Upgrade electrical service to 200 ampsalso service will be relocated to new wall · 283 m away
- 10205 Aqua Verde CtFeb 19, 2024Replacing 200 amp meter socket and federal pacific panel with new equipment of equal size · 307 m away
- 10204 Aqua Azul CtMay 30, 2024New construction electrical 6689 sq ft etj · 343 m away
- 10421 Jennys Jump DrOct 2, 2025Request to disconnect disconnect/reconnect to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 345 m away
- 10435 Jennys Jump DrSep 29, 2026Base: installing a backup battery system and additional meter socket · 414 m away
- 904 Valley View DrSep 29, 2026Base: etj- installing a (ftm) backup battery system and additional meter socket · 419 m away
- 10428 Jennys Jump DrMar 15, 2024*disconnect and reconnect * installing a home standby generator. the utility provider is austin energy and we are not doing any meter work · 421 m away
- 1008 Presa Arriba RdSep 20, 2024New electrical service for construction of sfr in the etj · 459 m away
- 10449 Jennys Jump DrFeb 5, 2009Bruton springs subdivision, amended plat of lot 37 & sterling acres lot 15 blk a — bruton springs subdivision, amended plat of lot 37 & sterling acres lot 15 block a · 482 m away