1104 Lipan Trl
Austin, TX 78733
Exterior electrical panel upgrade at 1104 Lipan Trl
An exterior electrical panel upgrade was permitted at 1104 Lipan Trl in Austin on July 24, 2026. City of Austin permit 2026-094548 EP is marked final.
Summarized from City of Austin records · updated Jul 24, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 24, 2026
- since Jul 24, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade exterior panel
- AppliedJul 22, 2026
- IssuedJul 24, 2026
- WorkJul '26 – Aug '26
- Final inspectionAug 3, 2026
Passed final inspection Aug 3, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectUpgrade exterior panel
Upgrade exterior panel
City of Austin permitElectrical PermitFinal- Record
- 2026-094548 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1104 Lipan Trl
What is being built at 1104 Lipan Trl?
The City of Austin permit describes an upgrade to an exterior electrical panel, not a new building. Permit 2026-094548 EP was filed on July 24, 2026, and is marked final.
What work was permitted at 1104 Lipan Trl?
The permit covers an exterior panel upgrade. It is an electrical permit from the City of Austin.
When was the electrical permit for 1104 Lipan Trl filed?
The City of Austin filed permit 2026-094548 EP on July 24, 2026.
Is the 1104 Lipan Trl permit complete?
The permit record is marked final. It describes an exterior panel upgrade.
Does the permit show a new home at 1104 Lipan Trl?
No new home is listed in this permit record. It describes an exterior electrical panel upgrade.
Also being built nearby
All of 78733- 1107 Lipan TrlJun 2, 2026New service for sfr in etj · 52 m away
- 1101 Lipan TrlJul 2, 2025Service upgrade · 84 m away
- 1107 Village West DrNov 1, 2024Upgrade to a 200amp · 88 m away
- 1008 Presa Arriba RdSep 20, 2024New electrical service for construction of sfr in the etj · 97 m away
- 1108 Castile RdJun 24, 2024New sfr at 1108 castile rd austin tx · 117 m away
- 913 Presa Arriba RdMay 10, 2024Etj-new sfr new construction wiring (ae) · 160 m away
- 1102 Castile RdFeb 18, 2025Coa etj t pole · 184 m away
- 1105 Castile RdNov 5, 2026Base: installing a backup battery system and additional meter socket · 202 m away
- 1124 San Augustine DrOct 14, 2025New construction in the etj sfr · 203 m away
- 1003 Lipan TrlDec 22, 2023Replacement of an existing water heater · 225 m away
- 1116 San Augustine DrMar 11, 2024Replace federal pacific panel with square d main 200 amp. no meter replacement no espa required. **disconnect/reconnect required per contractor · 258 m away
- 1103 Carlotta LnJun 11, 2026Installing existing panels (8.75 kw dc) from a previous installation on the rooftop of the existing residential home. in addition installing a new 11.5 kw ac inverter integrated with energy storage of 13.5 kw. the previous inverter installed is unknown · 260 m away