groundranger
Active · latest filing Oct 2026Residential

120 River Hills Rd

Austin, TX 78733

Backup battery system and meter socket permitted at 120 River Hills Rd

An active City of Austin electrical permit filed October 1, 2026, indicates a backup battery system and additional meter socket are being installed at 120 River Hills Rd. A separate electrical permit to replace a burnt-out panel and upgrade the meter to 320 amps was filed February 16, 2024, and is final.

Summarized from City of Austin records · updated Oct 1, 2026

Projects
2
2 filings
Latest filing
Oct 1, 2026
since Feb 16, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Base: installing a backup battery system and additional meter socket

  1. AppliedSep 16, 2026
  2. IssuedOct 1, 2026
  3. WorkOct '26 – May '27
  4. Final inspection
23% through of the permit windowOct 1, 2026 → May 3, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replace burnt out panel and upgrade meter size to 320 amps

    Replace burnt out panel and upgrade meter size to 320 amps

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 120 River Hills Rd

What is being built at 120 River Hills Rd?

A City of Austin electrical permit indicates installation of a backup battery system and an additional meter socket. Permit 2026-122203 EP was filed October 1, 2026, and is active.

When was the permit for 120 River Hills Rd filed?

The active permit for the backup battery system and additional meter socket was filed October 1, 2026. Its permit number is 2026-122203 EP.

Is the work at 120 River Hills Rd a new building?

The records provided show electrical work, not a new building permit. The active permit describes a backup battery system and an additional meter socket.

What electrical work was permitted at 120 River Hills Rd in 2024?

Permit 2024-012578 EP covered replacing a burnt-out panel and upgrading the meter size to 320 amps. It was filed February 16, 2024, and is final.

What is happening near Nutrabolt - The Overlook on River Hills Road?

At 120 River Hills Rd, an active electrical permit filed October 1, 2026, indicates installation of a backup battery system and an additional meter socket. Nutrabolt - The Overlook is listed 151 meters away.

Is a backup battery system being installed near Piper Sandler Expansion?

An active City of Austin permit at 120 River Hills Rd indicates a backup battery system and an additional meter socket. The address is listed 292 meters from Piper Sandler Expansion.

Also being built nearby

All of 78733
Email me when it passes final inspection