1304 N Cuernavaca Dr
Austin, TX 78733
Transfer switch work for a future generator
A City of Austin electrical permit filed October 15, 2025, covers disconnect/reconnect work and installation of a transfer switch as the main disconnect for a future generator at 1304 N Cuernavaca Dr. Permit 2025-128990 EP is listed with final status.
Summarized from City of Austin records · updated Oct 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 15, 2025
- since Oct 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledDisconnect/reconnect. installing transfer switch as main disconnect for future generator
- AppliedOct 6, 2025
- IssuedOct 15, 2025
- WorkOct '25 – Oct '25
- Final inspectionOct 23, 2025
Passed final inspection Oct 23, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectDisconnect/reconnect. installing transfer switch as main disconnect for future generator
Disconnect/reconnect. installing transfer switch as main disconnect for future generator
City of Austin permitElectrical PermitFinal- Record
- 2025-128990 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1304 N Cuernavaca Dr
What is being built at 1304 N Cuernavaca Dr?
The permit covers electrical work, including installing a transfer switch as the main disconnect for a future generator. It does not describe construction of a new building.
Is a generator being installed at 1304 N Cuernavaca Dr?
The October 15, 2025, permit describes a transfer switch for a future generator. It does not list a generator installation.
What does Austin permit 2025-128990 EP cover?
The City of Austin electrical permit covers disconnect/reconnect work and installation of a transfer switch as the main disconnect for a future generator.
When was the electrical permit filed for 1304 N Cuernavaca Dr?
The City of Austin permit was filed October 15, 2025. Its listed status is final.
Is there a new home being built at 1304 N Cuernavaca Dr?
The available City of Austin record describes electrical work for a future generator, not construction of a new home.
Also being built nearby
All of 78733- 1302 Cuernavaca DrMar 2, 2007Lot 7, block 52, austin lake hills section three · 29 m away
- 1300 Canyon Edge DrFeb 8, 2024Install new 1.66kw rooftop solar system for existing residential only. this is in addition to an existing solar system · 112 m away
- 1404 Cuernavaca DrMar 2, 2007D.l. garza equipment yard · 120 m away
- 1511 Village West DrMar 2, 2007Cuernavaca site plan · 125 m away
- 9706 Delgado WayMay 7, 2025Detaching electrical meter and breaker box from house while stucco gets repaired and then attaching back · 152 m away
- 1205 Miami DrJun 24, 2024Changing over service to secondary riser · 155 m away
- 1304 Daytona DrJun 15, 2026Pierce - 39-51670 - install new 5.76 kw rooftop solar system to existing residential only using backfed breaker only · 205 m away
- 1102 Cuernavaca DrMar 2, 2007Cuernavaca office/warehouse · 239 m away
- 1107 Canyon Edge DrApr 26, 2024Etj-new sfr (ae service) · 256 m away
- 1501 Canyon Edge DrJan 8, 202626kw whole home generator (natural gas) connected to house meter and main panel. austin energy disconnect required. (catalina chamseddine) · 263 m away
- 1112 San Augustine DrDec 29, 2024Request to disconnect remove se cable and replace with emt conduit riser and properly rated conductors for overhead service. overhead conductors will be spliced with ae approved connectors. service currently has a 200 amp meter can and main panel has a properly rated main breaker · 278 m away
- 1116 San Augustine DrMar 11, 2024Replace federal pacific panel with square d main 200 amp. no meter replacement no espa required. **disconnect/reconnect required per contractor · 293 m away