135 N Tumbleweed Trl
Austin, TX 78733
135 N Tumbleweed Trl: 1 project on record
City of Austin lists 1 filing across 1 project at 135 N Tumbleweed Trl, Austin, TX 78733. The most recent, filed June 20, 2024, covers: “Ev install”.
Compiled from City of Austin records · updated Jun 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 20, 2024
- since Jun 20, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv install
- AppliedJun 6, 2024
- IssuedJun 20, 2024
- WorkJun '24 – Dec '24
- Final inspectionJun 20, 2024
Passed final inspection Jun 20, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectEv install
Ev install
City of Austin permitElectrical PermitFinal- Record
- 2024-071389 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 135 N Tumbleweed Trl
What is being built at 135 N Tumbleweed Trl?
The latest filing (City of Austin permit 2024-071389 EP, June 20, 2024) covers ev install.
How many permits and filings does 135 N Tumbleweed Trl have?
1 filing across 1 project, from June 20, 2024 to June 20, 2024.
Is there other construction near 135 N Tumbleweed Trl?
Yes. Nearby filings include 131 N Tumbleweed Trl (homebuilder loop for new sfr in austin 2 mile etj. the t-pole had fallen and was deemed unsafe therefore ae removed the meter. weve repaired the t-pole and now need new inspections. as advised by the previous dsd rep and the building inspections department a new permit is required for inspections, Jan 11, 2024); 120 N Tumbleweed Trl (install a backup generator with automatic transfer switch on existing residential main electric service, Oct 16, 2026); 120 Tumbleweed Trl (tumbleweed trail estates, amended plat of lots 4 & 5 — tumbleweed trail estates, lot 4 & 5 amended plat, Feb 4, 2009).
How do I get alerts for new permits at 135 N Tumbleweed Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78733- 131 N Tumbleweed TrlJan 11, 2024Homebuilder loop for new sfr in austin 2 mile etj. the t-pole had fallen and was deemed unsafe therefore ae removed the meter. weve repaired the t-pole and now need new inspections. as advised by the previous dsd rep and the building inspections department a new permit is required for inspections · 9 m away
- 120 N Tumbleweed TrlOct 16, 2026Install a backup generator with automatic transfer switch on existing residential main electric service · 21 m away
- 120 Tumbleweed TrlFeb 4, 2009Tumbleweed trail estates, amended plat of lots 4 & 5 — tumbleweed trail estates, lot 4 & 5 amended plat · 101 m away
- 9604 Southward CvMar 13, 2024Replace old panel with current panel · 196 m away
- 155 Tumbleweed TrlMar 2, 2007155 n. tumbleweed trail · 270 m away
- 9700 Timber Ridge PassOct 14, 2025Tree knocked down power lines going to a permanent overhead service pole service pole also got knocked down. repair service pole upgrade meter socket to todays ae approval meter socket ground service · 333 m away
- 204 N Tumbleweed TrlApr 9, 2026Upgrade duplex electric service to 200 a. for each unit. unit a & b · 341 m away
- 103 Westward CvJan 6, 2026Install 200amp oh service · 386 m away
- 9701 Timber Ridge PassNov 12, 2026Etj base: installing a backup battery system and additional meter socket. austin energy customer · 394 m away
- 9704 Timber Ridge PassJan 11, 2024Request to disconnect. install tesla backup gateway. overhead. ae. meter can not replaced - no espa · 398 m away
- 9705 Timber Ridge PassJul 31, 2026Owner its going to remove old siding for new sidingelectrical services its attach to the wall i make suggestion to owner to get meter service upgrade to 200 amps because old meter looks old and not to nec standars · 442 m away
- 202 S Tumbleweed TrlMay 23, 2025Nema three exterior 24 circuit subpanel replacement removing replacement existing panel and while were there and install a two pole 30 amp gfi breaker feeding car charger · 445 m away