605 N Tumbleweed Trl
Austin, TX 78733
605 N Tumbleweed Trl: 1 project on record
City of Austin lists 1 filing across 1 project at 605 N Tumbleweed Trl, Austin, TX 78733. The most recent, filed August 14, 2024, covers: “Build new 400amp service loop 1ph”.
Compiled from City of Austin records · updated Aug 14, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 14, 2024
- since Aug 14, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredBuild new 400amp service loop 1ph
- AppliedAug 6, 2024
- IssuedAug 14, 2024
- !WorkAug '24 – Feb '25
- Final inspection
Marked expired Feb 11, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectBuild new 400amp service loop 1ph
Build new 400amp service loop 1ph
City of Austin permitElectrical PermitExpired- Record
- 2024-098986 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 605 N Tumbleweed Trl
What is being built at 605 N Tumbleweed Trl?
The latest filing (City of Austin permit 2024-098986 EP, August 14, 2024) covers build new 400amp service loop 1ph.
How many permits and filings does 605 N Tumbleweed Trl have?
1 filing across 1 project, from August 14, 2024 to August 14, 2024.
Is there other construction near 605 N Tumbleweed Trl?
Yes. Nearby filings include 401 Tumbleweed Trl (h. a. reed subdivision, resubdivision of tract one — h. a. reed subdivision, resubdivision of tract one, Mar 17, 2009); 9200 Marilina Ln (temporary meter loop, Mar 10, 2025); 9110 Marilina Ln (construction temp power. etj, Oct 22, 2025).
How do I get alerts for new permits at 605 N Tumbleweed Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78733- 401 Tumbleweed TrlMar 17, 2009H. a. reed subdivision, resubdivision of tract one — h. a. reed subdivision, resubdivision of tract one · 208 m away
- 9200 Marilina LnMar 10, 2025Temporary meter loop · 224 m away
- 9110 Marilina LnOct 22, 2025Construction temp power. etj · 252 m away
- 409 N Tumbleweed TrlFeb 8, 2024Install new 3.96kw rooftop solar system for existing residential only. this is in addition to an existing solar system · 275 m away
- 320 N Tumbleweed TrlApr 4, 2024Install new 11.060kw rooftop solar system and 13.5kw energy storage system for existing residential only · 276 m away
- 811 N Tumbleweed TrlMay 20, 2025Request to disconnect contractor temporary disconnect required to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size · 291 m away
- 302 Tumbleweed TrlDec 8, 2008Burson subdivision — burson subdivision · 304 m away
- 9300 Stallion DrDec 4, 2025Hidden oaks estates subdivision · 324 m away
- 9000 Marly CvJun 11, 2014Seven oaks, section 5, block b, lots 31 & 32; vacation · 326 m away
- 701 Marly WayJul 14, 2026Temporary power for new residential home · 334 m away
- 9108 Brookhurst CvOct 16, 2024Request to disconnect - installation of (qty. 1) 200a service-rated automatic transfer switch (to tie into existing 200a main panel) (qty. 1) 150a service-rated automatic transfer switch (to replace existing 150a main breaker enclosure) 48kw whole home generator additional grounding · 351 m away
- 1100 Bowie RdJun 11, 2008Oak bluffs · 352 m away