9101 Brookhurst Cv
Austin, TX 78733
9101 Brookhurst Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 9101 Brookhurst Cv, Austin, TX 78733. The most recent, filed April 19, 2024, covers: “*request to disconnect* install 150-amp and 200-amp transfer switches at main service for generator”.
Compiled from City of Austin records · updated Apr 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 19, 2024
- since Apr 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled*request to disconnect* install 150-amp and 200-amp transfer switches at main service for generator
- AppliedApr 18, 2024
- IssuedApr 19, 2024
- WorkApr '24 – May '24
- Final inspectionMay 8, 2024
Passed final inspection May 8, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 project*request to disconnect* install 150-amp and 200-amp transfer switches at main service for generator
*request to disconnect* install 150-amp and 200-amp transfer switches at main service for generator
City of Austin permitElectrical PermitFinal- Record
- 2024-048693 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9101 Brookhurst Cv
What is being built at 9101 Brookhurst Cv?
The latest filing (City of Austin permit 2024-048693 EP, April 19, 2024) covers *request to disconnect* install 150-amp and 200-amp transfer switches at main service for generator.
How many permits and filings does 9101 Brookhurst Cv have?
1 filing across 1 project, from April 19, 2024 to April 19, 2024.
Is there other construction near 9101 Brookhurst Cv?
Yes. Nearby filings include 9108 Brookhurst Cv (request to disconnect - installation of (qty. 1) 200a service-rated automatic transfer switch (to tie into existing 200a main panel) (qty. 1) 150a service-rated automatic transfer switch (to replace existing 150a main breaker enclosure) 48kw whole home generator additional grounding, Oct 16, 2024); 9120 Brookhurst Cv (installation of solar panels, Jun 16, 2025); 401 Tumbleweed Trl (h. a. reed subdivision, resubdivision of tract one — h. a. reed subdivision, resubdivision of tract one, Mar 17, 2009).
How do I get alerts for new permits at 9101 Brookhurst Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78733- 9108 Brookhurst CvOct 16, 2024Request to disconnect - installation of (qty. 1) 200a service-rated automatic transfer switch (to tie into existing 200a main panel) (qty. 1) 150a service-rated automatic transfer switch (to replace existing 150a main breaker enclosure) 48kw whole home generator additional grounding · 78 m away
- 9120 Brookhurst CvJun 16, 2025Installation of solar panels · 104 m away
- 401 Tumbleweed TrlMar 17, 2009H. a. reed subdivision, resubdivision of tract one — h. a. reed subdivision, resubdivision of tract one · 213 m away
- 9110 Marilina LnOct 22, 2025Construction temp power. etj · 257 m away
- 9207 Stallion DrJul 3, 2024Repair riser · 265 m away
- 9000 Marly CvJun 11, 2014Seven oaks, section 5, block b, lots 31 & 32; vacation · 275 m away
- 9300 Stallion DrDec 4, 2025Hidden oaks estates subdivision · 278 m away
- 9200 Marilina LnMar 10, 2025Temporary meter loop · 290 m away
- 9102 Atwater CvMar 17, 2009Lake ridge heights (withdrawal & resubmittal of c8-97-0176.0a) — lake ridge heights (withdrawal & resubmittal of c8-97-0176.0a) · 293 m away
- 9022 Atwater CvFeb 6, 2009Seven oaks sec 2 ph 2, amended plat of lots 2 & 3, block b — seven oaks sec 2 ph 2, amended plat of lots 2 & 3, block b · 350 m away
- 100 Brandon WayDec 11, 2024Replace electrical panel · 372 m away
- 700 Brandon WayFeb 25, 202548kw whole home generator (natural gas) connected to house meter and main panel. austin energy disconnect required. (derrik deyhimi) · 377 m away