groundranger
Active · latest filing Nov 2026Residential

102 Carefree Cir

Austin, TX 78734

102 Carefree Cir: 1 project on record

City of Austin lists 1 filing across 1 project at 102 Carefree Cir, Austin, TX 78734. The most recent, filed November 17, 2026, covers: “Base: installing a backup battery system and additional meter socket”.

Compiled from City of Austin records · updated Nov 17, 2026

Projects
1
1 filings
Latest filing
Nov 17, 2026
since Nov 17, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Base: installing a backup battery system and additional meter socket

  1. AppliedNov 2, 2026
  2. IssuedNov 17, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
1% through of the permit windowNov 17, 2026 → May 16, 2027

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 102 Carefree Cir

What is being built at 102 Carefree Cir?

The latest filing (City of Austin permit 2026-144672 EP, November 17, 2026) covers base: installing a backup battery system and additional meter socket.

How many permits and filings does 102 Carefree Cir have?

1 filing across 1 project, from November 17, 2026 to November 17, 2026.

Is there other construction near 102 Carefree Cir?

Yes. Nearby filings include 207 Lake Como Dr (installation of 16.56kw solar pv and 13.5kwh energy storage system to residence, Aug 5, 2025); 107 Harbor Hill Dr (disconnect/reconnect power to fix stripped lug on feeder line. 6/23/26 sm - per christian munoz (512-815-2570) operations manager with freedom solar this permit is not needed. the concern was misdiagnosed by a different electrician and they confirmed everything is fine and requested this permit to be voided, Jun 23, 2026); 112 Spellbrook Ln (solar panel installation, Sep 5, 2024).

How do I get alerts for new permits at 102 Carefree Cir?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78734
Email me when it passes final inspection