groundranger
Historic · latest filing May 2025Residential

14415 Cochise Trl

Austin, TX 78734

Energy storage system permitted at an existing Austin home

Austin permits show a new energy storage system being installed at the existing single-family home at 14415 Cochise Trl. The electrical permit was filed May 1, 2025, and is marked final. A separate permit records a 14.18-kilowatt rooftop solar system in October 2023.

Summarized from City of Austin records · updated May 1, 2025

Projects
4
4 filings
Latest filing
May 1, 2025
since Feb 19, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new energy storage system to existing single family residence. ae

  1. AppliedApr 18, 2025
  2. IssuedMay 1, 2025
  3. WorkMay '25 – Oct '25
  4. Final inspectionMay 14, 2025

Passed final inspection May 14, 2025.

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. Install new energy storage system to existing single family residence. ae

    Install new energy storage system to existing single family residence. ae

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Utility disconnect/reconnect. install tesla backup switch. overhead. ae. meter can does not need replacing- no espa attached

    Utility disconnect/reconnect. install tesla backup switch. overhead. ae. meter can does not need replacing- no espa attached

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Install new energy storage system to existing single family residence. ae

    Install new energy storage system to existing single family residence. ae

    City of Austin permitElectrical PermitWithdrawn
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Install 14.18kw dc roof mounted solar system

    Install 14.18kw dc roof mounted solar system

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 14415 Cochise Trl

What is being installed at 14415 Cochise Trl?

A City of Austin permit describes installation of a new energy storage system at an existing single-family residence. Permit 2025-047549 EP was filed May 1, 2025, and is marked final.

When was the energy storage system permitted at 14415 Cochise Trl?

The permit was filed May 1, 2025. City of Austin record 2025-047549 EP is marked final.

Does 14415 Cochise Trl have rooftop solar?

A City of Austin electrical permit filed October 5, 2023, describes a 14.18-kilowatt DC rooftop solar system. Permit 2023-126417 EP is marked final.

What electrical work was permitted at 14415 Cochise Trl in February 2025?

Permit 2025-015130 EP, filed February 19, 2025, records a utility disconnect and reconnect and installation of a Tesla backup switch. A separate energy storage permit filed that day, 2025-015128 EP, was withdrawn.

Is a new home being built at 14415 Cochise Trl?

The listed permits describe electrical work at an existing single-family residence, including an energy storage system and rooftop solar. They do not describe a new home at this address.

Also being built nearby

All of 78734

More warehouses & industrial in 78734, new homes in 78734.

Email me when a new permit is filed