groundranger
Historic · latest filing Jan 2024Residential

15210 Rainbow One

Austin, TX 78734

15210 Rainbow One: 2 projects on record

City of Austin lists 2 filings across 2 projects at 15210 Rainbow One, Austin, TX 78734. The most recent, filed January 22, 2024, covers: “Install new 35.2kw rooftop solar system and 67.5kw energy storage system to existing residential only. also included is line side tap for pv and/or ess with system”.

Compiled from City of Austin records · updated Jan 22, 2024

Projects
2
2 filings
Latest filing
Jan 22, 2024
since Jan 22, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit expired

Install new 35.2kw rooftop solar system and 67.5kw energy storage system to existing residential only. also included is line side tap for pv and/or ess with system

  1. AppliedMay 2, 2023
  2. IssuedJan 22, 2024
  3. !WorkJan '24 – Jul '24
  4. Final inspection

Marked expired Jul 21, 2024.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install new 35.2kw rooftop solar system and 67.5kw energy storage system to existing residential only. also included is line side tap for pv and/or ess with system

    Install new 35.2kw rooftop solar system and 67.5kw energy storage system to existing residential only. also included is line side tap for pv and/or ess with system

    City of Austin permitElectrical PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect power to tie in pv/ess components.we are not upgrading the size of the service not upgrading the meter size

    Disconnect/reconnect power to tie in pv/ess components.we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 15210 Rainbow One

What is being built at 15210 Rainbow One?

The latest filing (City of Austin permit 2023-054552 EP, January 22, 2024) covers install new 35.2kw rooftop solar system and 67.5kw energy storage system to existing residential only. also included is line side tap for pv and/or ess with system.

How many permits and filings does 15210 Rainbow One have?

2 filings across 2 projects, from January 22, 2024 to January 22, 2024.

Is there other construction near 15210 Rainbow One?

Yes. Nearby filings include 15204 Rainbow Two (request to disconnect replacing oh 200amp service like for like. we will be raising service only vertically to raise the elevation above the height of the balcony, Jan 29, 2024); 5503 Lands End (new - 39-10944 - install new 5.76kw rooftop solar system to existing residential only using backfed breaker, Nov 24, 2025); 15101 Back Of The Moon (back of the moon subd. no. 2 **expired** (was with d & resubmittal) — back of the moon subd. no. 2 **expired** (was with d & resubmittal), May 8, 2009).

How do I get alerts for new permits at 15210 Rainbow One?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78734

More warehouses & industrial in 78734, solar installs in 78734.

Email me when a new permit is filed