groundranger
Recent · latest filing May 2026Residential

15408 Stroup Cir

Austin, TX 78734

500-amp electrical service permitted at 15408 Stroup Cir

A new 500-amp overhead electrical service, meter base and three main panels are covered by an Austin electrical permit at 15408 Stroup Cir. Permit 2026-061578 EP was filed May 18, 2026, and is marked Final.

Summarized from City of Austin records · updated May 18, 2026

Projects
1
1 filings
Latest filing
May 18, 2026
since May 18, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new 500-amp overhead rack service including 500-amp transocket meter base 1 200-amp main panel and 2 150-amp main panels

  1. AppliedMay 15, 2026
  2. IssuedMay 18, 2026
  3. WorkMay '26 – Aug '26
  4. Final inspectionAug 26, 2026

Passed final inspection Aug 26, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Install new 500-amp overhead rack service including 500-amp transocket meter base 1 200-amp main panel and 2 150-amp main panels

    Install new 500-amp overhead rack service including 500-amp transocket meter base 1 200-amp main panel and 2 150-amp main panels

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 15408 Stroup Cir

What is being built at 15408 Stroup Cir?

An Austin permit covers installation of a new 500-amp overhead electrical service, a 500-amp transocket meter base and three main panels.

When was the electrical permit filed?

Permit 2026-061578 EP was filed May 18, 2026.

What electrical work does permit 2026-061578 EP cover?

The permit describes a 500-amp overhead service, one 500-amp transocket meter base, one 200-amp main panel and two 150-amp main panels.

Is the permit for 15408 Stroup Cir final?

Yes. The City of Austin permit record lists permit 2026-061578 EP as Final.

How many main panels are listed in the permit?

Three: one 200-amp main panel and two 150-amp main panels.

Does the permit confirm a new home is being built?

The permit describes electrical service and panels. It does not specify that a new home is being built.

Also being built nearby

All of 78734
Email me when a new permit is filed