3500 N FM 620 Rd
Austin, TX 78734
Solar panels and battery storage permitted for residence
An Austin permit filed October 2, 2025, covers a 60.2 kW DC rooftop solar system and 67.5 kWh energy storage system at this residence. A separate permit filed September 18, 2025, covers replacement of the home's electrical service.
Summarized from City of Austin records · updated Oct 2, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 2, 2025
- since Sep 18, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of 60.2 kw dc solar pv system to roof of residence with 67.5 kwh energy storage system
- AppliedSep 25, 2025
- IssuedOct 2, 2025
- WorkOct '25 – Mar '26
- Final inspectionDec 16, 2025
Passed final inspection Dec 16, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstallation of 60.2 kw dc solar pv system to roof of residence with 67.5 kwh energy storage system
Installation of 60.2 kw dc solar pv system to roof of residence with 67.5 kwh energy storage system
City of Austin permitElectrical PermitFinal- Record
- 2025-122140 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace existing 120/240v high leg delta service with 120/240v single phase 350a service on residential home. disconnect/reconnect to be scheduled with austin energy
Replace existing 120/240v high leg delta service with 120/240v single phase 350a service on residential home. disconnect/reconnect to be scheduled with austin energy
City of Austin permitElectrical PermitFinal- Record
- 2025-117454 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3500 N FM 620 Rd
What is being built at 3500 N FM 620 Rd?
An Austin permit covers installation of a rooftop solar PV system and energy storage at the residence. The system is listed as 60.2 kW DC with 67.5 kWh of storage.
When was the solar permit filed for 3500 N FM 620 Rd?
The solar electrical permit, 2025-122140 EP, was filed October 2, 2025. It is listed with a Final status.
Is battery storage included with the solar installation?
Yes. Permit 2025-122140 EP describes a 67.5 kWh energy storage system alongside the rooftop solar PV installation.
Is the electrical service being replaced at 3500 N FM 620 Rd?
A separate permit covers replacing the existing 120/240-volt high-leg delta service with a 120/240-volt single-phase 350-amp service. The permit, 2025-117454 EP, was filed September 18, 2025.
What is being permitted near JuiceLand on FM 620?
At 3500 N FM 620 Rd, Austin permits cover a rooftop solar system with battery storage and a separate residential electrical-service replacement. JuiceLand is listed at 3303 N FM 620 Rd.
Also being built nearby
All of 78734- 3411 FM 620 RdMar 2, 2007Austin engineering site plan two · 53 m away
- 3519 FM 620 RdJul 4, 2017Mountain view · 140 m away
- 3317 FM 620 RdAug 17, 2026Lakeway holdings lp · 145 m away
- 3303 N FM 620 RdDec 4, 2023Install channel letters. juiceland. north west elevation · 278 m away
- 3209 FM 620 RdSep 4, 2017Blanchard retail · 346 m away
- 3623 FM 620 RdMar 2, 2007Davenport storage · 353 m away
- 3205 FM 620 RdFeb 23, 2012Blanchard commercial (site plan extension) · 372 m away
- 15402 Blanchard DrNov 10, 2010Strass equipment leasing, inc · 373 m away
- 3207 Neidhardt DrJun 3, 2014Lake travis regional recycle and reuse facility · 407 m away
- 3636 N Ranch Road 620 · Nnn Reit LPFeb 12, 20267 - eleven (36559) — renovation/alteration — the scope of work encompasses the installation of new and/or relocation of existing beverage equipment, gondolas, and food warming equipment, along with necessary modifications to the existing plumbing and electrical systems to accommodate · 420 m away
- 15516 General Williamson DrOct 14, 2010Lake travis fire rescue station #601 · 421 m away
- 3606 San Antonio StDec 21, 2023New construction of sfr in etj · 443 m away
More warehouses & industrial in 78734, solar installs in 78734.