2300 Barton Creek Blvd
Austin, TX 78735
Electrical and water-heater work at 2300 Barton Creek Blvd
Austin permits at 2300 Barton Creek Blvd cover electrical and plumbing work, including installation of a 48 kW generator and replacement or installation of water heaters. The filings run from June 13, 2025, through October 27, 2026; they describe work to building systems, not a new building project.
Summarized from City of Austin records · updated Oct 27, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Oct 27, 2026
- since Oct 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayInstall 200 amp ats. meter and meter enclosure to remain as existing. install 48 kw generator
- AppliedOct 20, 2026
- IssuedOct 27, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
7 projectsInstall 200 amp ats. meter and meter enclosure to remain as existing. install 48 kw generator
Install 200 amp ats. meter and meter enclosure to remain as existing. install 48 kw generator
City of Austin permitElectrical PermitActive- Record
- 2026-138391 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
2-50gal gas water heaters and a water softener
2-50gal gas water heaters and a water softener
City of Austin permitPlumbing PermitActive- Record
- 2026-090975 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater removing existing water heater in attic and installing new 50 gallon natural gas water heater in attic
Replacement of an existing water heater removing existing water heater in attic and installing new 50 gallon natural gas water heater in attic
City of Austin permitPlumbing PermitActive- Record
- 2026-073810 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater install 40gal water heater
Replacement of an existing water heater install 40gal water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-152386 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Repair/rebuild electrical service replace main overcurrent protection and meter socket
Repair/rebuild electrical service replace main overcurrent protection and meter socket
City of Austin permitElectrical PermitFinal- Record
- 2025-070933 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace 2 water heaters with tankless water heater to existing condominium.etj** ref 2011-100022
Replace 2 water heaters with tankless water heater to existing condominium.etj** ref 2011-100022
City of Austin permitPlumbing PermitFinal- Record
- 2012-067049 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect - installation of 30 kw generator installation of 200 amp service rated ats whole house surge protection and additional grounding
Request to disconnect - installation of 30 kw generator installation of 200 amp service rated ats whole house surge protection and additional grounding
City of Austin permitElectrical PermitFinal- Record
- 2024-133102 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2300 Barton Creek Blvd
What is being built at 2300 Barton Creek Blvd in Austin?
The Austin permit records describe electrical and plumbing work, not a new building. The latest filing, permit 2026-138391 EP, covers a 48 kW generator installation and a 200-amp automatic transfer switch.
Is a new building planned at 2300 Barton Creek Blvd?
The records provided do not identify a new building project. They list electrical service work, generator installation, and water-heater work.
What does permit 2026-138391 EP cover?
Filed October 27, 2026, the electrical permit covers installation of a 200-amp automatic transfer switch and a 48 kW generator. It says the existing meter and meter enclosure will remain.
Are new water heaters being installed at 2300 Barton Creek Blvd?
Yes. Permit 2026-090975 PP, filed July 28, 2026, covers two 50-gallon gas water heaters and a water softener. A July 15, 2026, permit covers replacement of an attic water heater with a 50-gallon natural-gas unit.
When were permits filed for work at 2300 Barton Creek Blvd?
The five records span June 13, 2025, to October 27, 2026. They include electrical permits filed in June 2025 and October 2026, and plumbing permits filed in December 2025 and July 2026.
What is the project cost at 2300 Barton Creek Blvd?
The permit records provided do not report a project cost or permit valuation.
Also being built nearby
All of 78735- 8500 Chalk Knoll DrJan 31, 2024Installation and commissioning of a 60kw generator. plumber will add additional ng plumbing to fuel the generator · 221 m away
- 2305 Barton Creek BlvdMay 22, 2025Tunnel approximately 30 ft to correct failed laundry line · 242 m away
- 2316 Barton Creek BlvdMar 2, 2007Travis county m.u.d. no. 4 water treatment plant expansion · 292 m away
- 1906 Barton Creek BlvdMay 16, 2024Electrical service for new sfr construction in etj (19000 sq ft) · 321 m away
- 2500 Barton Creek Blvd · Querencia At Barton CreekApr 18, 2024Querencia at barton creek — renovation/alteration — paint/finishes (8,605sf of renovation) to an existing 4-story al/mc, skilled nursing facility. limited to 1st floor al commons / corridors, 2nd floor al staff / commons, 3rd floor snf dining, staff areas, and activity space · 350 m away
- 1907 Barton Creek BlvdNov 25, 2008Barton creek club driving range — barton creek club driving range · 406 m away
- 8224 Chalk Knoll DrFeb 7, 2025Temporary meter loop etj · 423 m away
- 2610 Chalk Knoll CvDec 8, 2023Request for disconnect install generator and transfer switch disconnect / reconnect · 472 m away
- 8212 Barton Club DrMar 9, 2026Barton creek section n tecoma circle phase 2 · 503 m away
- 8201 Chalk Knoll DrDec 10, 2024Request to disconnect install 200 amp ats and 38kw generator · 594 m away