Electrical service upgrade and temporary construction loop
Electrical permits for this residence cover a temporary construction loop and an upgrade from 200-amp to 350-amp electrical service. The temporary loop permit was filed December 1, 2025, and the service upgrade permit was filed March 2, 2026; the upgrade is listed as active.
Summarized from City of Austin records · updated Mar 2, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 2, 2026
- since Dec 1, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayUpgrade from 200amp to 350amp service
- AppliedJul 21, 2025
- IssuedMar 2, 2026
- WorkMar '26 – Aug '26
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsUpgrade from 200amp to 350amp service
Upgrade from 200amp to 350amp service
City of Austin permitElectrical PermitActive- Record
- 2025-091016 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Temp construction loop
Temp construction loop
City of Austin permitElectrical PermitFinal- Record
- 2025-148683 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3104 Sweet Autumn Cv
What is being built at 3104 Sweet Autumn Cv?
The permits describe electrical work at the residence: a temporary construction loop and an upgrade from 200-amp to 350-amp service. They do not specify a new building.
Is a new house being built at 3104 Sweet Autumn Cv?
The records provided list electrical permits, not a new-home building permit. One permit is for a temporary construction loop, and another is for an electrical service upgrade.
When was the electrical work permitted at 3104 Sweet Autumn Cv?
The temporary construction loop permit, 2025-148683 EP, was filed December 1, 2025. The service upgrade permit, 2025-091016 EP, was filed March 2, 2026.
What does the electrical service upgrade at 3104 Sweet Autumn Cv involve?
Permit 2025-091016 EP describes an upgrade from 200-amp to 350-amp service. It was filed March 2, 2026, and is listed as active.
What is the temporary construction loop permit for at 3104 Sweet Autumn Cv?
The City of Austin permit description says “Temp construction loop.” Permit 2025-148683 EP was filed December 1, 2025, and is listed as final.
What is happening near Catholic High School For Austin?
At 3104 Sweet Autumn Cv, about 441 meters from Catholic High School For Austin, City of Austin permits describe a temporary construction loop and an electrical service upgrade from 200 to 350 amps.
What is happening near 2800 Barton Creek Blvd?
The residence at 3104 Sweet Autumn Cv, about 490 meters away, has permits for a temporary construction loop and an upgrade to 350-amp electrical service.
Also being built nearby
All of 78735- 3101 Sweet Autumn CvOct 30, 2026Base: installing a backup battery system and additional meter socket · 114 m away
- 3203 Sweet Autumn CvMar 24, 2025Upgrade an existing 200 amp underground service to a 400 amp service. see attached espa and ae design wr#584000 · 131 m away
- 8721 Mendocino DrMar 10, 2025Replacement of an existing water heater navien 240a2 tankless wh · 169 m away
- 8709 Mendocino DrNov 17, 2026Etj - base: installing a backup battery system and additional meter socket · 176 m away
- 8500 Boxelder CvMay 2, 2024Request to disconnect contractor temporarily disconnect required to tie in pv/ess components. need to rewire the main circuit breaker as it is backwards. we are not upgrading the size of the service not upgrading the meter size · 355 m away
- 3712 Lost Creek BlvdJan 16, 2024Replace existing underground service to residence only · 369 m away
- 2912 Maravillas LoopMar 20, 2025Replacing/repairing tankless water heater is casita attic · 375 m away
- 8501 Navidad DrAug 5, 2025**austin 2-mile etj** replacement of an existing water heater installing like/like g water heater · 388 m away
- 3200 Clumpgrass CvAug 5, 2025Repairing the underground conduit that enters the meter base. the pvc conduit has dropped out of the meter base exposing the utility wires. we will ultimately need to add a 6 piece of pvc to extend to pvc back into the meter base · 414 m away
- 3000 Barton Creek Blvd · Catholic High School For AustinMay 5, 2026Smca portables — renovation/alteration — additions of portable buildings to site · 441 m away
- 2800 Barton Creek Blvd · 2800 Barton Creek Blvd.Jul 18, 2024Cafe largesse — renovation/alteration — renovation of existing building for new tenant space for coffee shop · 490 m away
- 2800 Barton Creek BlvdApr 8, 2025Upgraded service amperage for unit 100 add 400amp service for unit 104. customer to re-build service to todays standards as latest one line indicates. customer was given an exception to line of sight by robert ruiz and was instructed by robert to install proper placards at ae transformer/pull box and service/disconnect location · 492 m away