4400 Mesquite Spring Cv
Austin, TX 78735
4400 Mesquite Spring Cv: 2 projects on record
City of Austin lists 2 filings across 2 projects at 4400 Mesquite Spring Cv, Austin, TX 78735. The most recent, filed September 4, 2024, covers: “Upgrade main electric service to 200 amps”.
Compiled from City of Austin records · updated Sep 4, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Sep 4, 2024
- since Sep 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledUpgrade main electric service to 200 amps
- AppliedAug 28, 2024
- IssuedSep 4, 2024
- WorkSep '24 – Nov '24
- Final inspectionNov 21, 2024
Passed final inspection Nov 21, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsUpgrade main electric service to 200 amps
Upgrade main electric service to 200 amps
City of Austin permitElectrical PermitFinal- Record
- 2024-110015 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work thu 7/13/2023 @ 10am v
Replacement of complete existing central heat and air system with or without duct work thu 7/13/2023 @ 10am v
City of Austin permitMechanical PermitFinal- Record
- 2023-073964 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4400 Mesquite Spring Cv
What is being built at 4400 Mesquite Spring Cv?
The latest filing (City of Austin permit 2024-110015 EP, September 4, 2024) covers upgrade main electric service to 200 amps.
How many permits and filings does 4400 Mesquite Spring Cv have?
2 filings across 2 projects, from September 4, 2024 to September 4, 2024.
Is there other construction near 4400 Mesquite Spring Cv?
Yes. Nearby filings include 4404 Mesquite Spring Cv (i would like to upgrade a service and meter to 200 amps. the homeowner is requesting a panel change and upgrade to accommodate for an electric car charger, Feb 24, 2026); 5001 Trail West Dr (express: replace existing tub/shower with acrylic unit, May 16, 2025); 4406 Mesquite Spring Cv (construct new driveway approach of 18 ft, Oct 29, 2026).
How do I get alerts for new permits at 4400 Mesquite Spring Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78735- 4404 Mesquite Spring CvFeb 24, 2026I would like to upgrade a service and meter to 200 amps. the homeowner is requesting a panel change and upgrade to accommodate for an electric car charger · 34 m away
- 5001 Trail West DrMay 16, 2025Express: replace existing tub/shower with acrylic unit · 43 m away
- 4406 Mesquite Spring CvOct 29, 2026Construct new driveway approach of 18 ft · 49 m away
- 4403 Mesquite Spring CvJan 3, 2024Upgrade main electric service and install evse at garage · 51 m away
- 5007 Trail West DrJun 29, 2026Add 100amp sub panel in garage from main panel replace and upgrade main panel add mini split circuit and outlets in garage · 64 m away
- 4927 Trail West DrMar 6, 2025Install level 2 ev charger · 79 m away
- 5009 Trail West DrAug 6, 2025200 amp panel and meter can ground and bonding · 90 m away
- 4925 Trail West DrJun 18, 2025Request to disconnect - installing new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 150 amp service with 150 amp ats main panel replacement (150a) · 91 m away
- 5008 Trail West DrJun 12, 2025Tunnel under house to repair back fall in kitchen sink 15 feet inside the foundation · 103 m away
- 4932 Trail West DrApr 24, 2025Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 4930 Trail West DrJan 22, 2025Doing an upgrade from 150 amp to a 200 amp. ae approved meter can and doing new grounding to upsize the meter to match the panel for a new solar · 110 m away
- 4928 Trail West DrMay 6, 2026Replacing outdoor main panel like for like currently 125a panel new panel will be 125a main outdoor breaker panel with proof of grounding and surge protection · 120 m away