Rooftop solar and battery permitted at 4424 Sacred Arrow Dr

City of Austin permits indicate a 10.2 kW rooftop solar system and 13.5 kW battery storage system are being installed at the existing residence at 4424 Sacred Arrow Dr. The solar and storage permit was filed April 25, 2025; a separate permit filed April 1 covers connecting the components and installing a backup switch. Both permits are marked final.

Summarized from City of Austin records · updated Apr 25, 2025

Projects
2
2 filings
Latest filing
Apr 25, 2025
since Apr 1, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new 10.2kw rooftop solar system and 13.5kw battery storage system for existing residential only

  1. AppliedMar 31, 2025
  2. IssuedApr 25, 2025
  3. WorkApr '25 – Oct '25
  4. Final inspectionSep 9, 2025

Passed final inspection Sep 9, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install new 10.2kw rooftop solar system and 13.5kw battery storage system for existing residential only

    Install new 10.2kw rooftop solar system and 13.5kw battery storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Idisconnect/reconnect power to tie in pv/ess components and install a tesla socket mounted backup switch that is rated up to 200amp. we are not upgrading the size of the service not upgrading the meter size

    Idisconnect/reconnect power to tie in pv/ess components and install a tesla socket mounted backup switch that is rated up to 200amp. we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4424 Sacred Arrow Dr

What is being built at 4424 Sacred Arrow Dr?

City of Austin permit 2025-038134 EP indicates installation of a 10.2 kW rooftop solar system and 13.5 kW battery storage system at the existing residence. The permit was filed April 25, 2025.

Is a new home being built at 4424 Sacred Arrow Dr?

The permit describes work at an existing residence, not construction of a new home. It covers a rooftop solar system and battery storage.

How large is the solar system at 4424 Sacred Arrow Dr?

The April 25, 2025 permit lists a 10.2 kW rooftop solar system and 13.5 kW battery storage system.

What does permit 2025-038169 EP cover?

Filed April 1, 2025, the permit covers disconnecting and reconnecting power to tie in the solar and energy storage components, and installing a backup switch rated up to 200 amps.

Is the electrical service being upgraded at 4424 Sacred Arrow Dr?

No service-size or meter-size upgrade is described in permit 2025-038169 EP. The permit says the work does not upgrade either size.

Are the permits for the solar installation final?

Both City of Austin electrical permits, 2025-038134 EP and 2025-038169 EP, are listed with final status.