4424 Sacred Arrow Dr
Austin, TX 78735
Rooftop solar and battery permitted at 4424 Sacred Arrow Dr
City of Austin permits indicate a 10.2 kW rooftop solar system and 13.5 kW battery storage system are being installed at the existing residence at 4424 Sacred Arrow Dr. The solar and storage permit was filed April 25, 2025; a separate permit filed April 1 covers connecting the components and installing a backup switch. Both permits are marked final.
Summarized from City of Austin records · updated Apr 25, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Apr 25, 2025
- since Apr 1, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new 10.2kw rooftop solar system and 13.5kw battery storage system for existing residential only
- AppliedMar 31, 2025
- IssuedApr 25, 2025
- WorkApr '25 – Oct '25
- Final inspectionSep 9, 2025
Passed final inspection Sep 9, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall new 10.2kw rooftop solar system and 13.5kw battery storage system for existing residential only
Install new 10.2kw rooftop solar system and 13.5kw battery storage system for existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2025-038134 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Idisconnect/reconnect power to tie in pv/ess components and install a tesla socket mounted backup switch that is rated up to 200amp. we are not upgrading the size of the service not upgrading the meter size
Idisconnect/reconnect power to tie in pv/ess components and install a tesla socket mounted backup switch that is rated up to 200amp. we are not upgrading the size of the service not upgrading the meter size
City of Austin permitElectrical PermitFinal- Record
- 2025-038169 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4424 Sacred Arrow Dr
What is being built at 4424 Sacred Arrow Dr?
City of Austin permit 2025-038134 EP indicates installation of a 10.2 kW rooftop solar system and 13.5 kW battery storage system at the existing residence. The permit was filed April 25, 2025.
Is a new home being built at 4424 Sacred Arrow Dr?
The permit describes work at an existing residence, not construction of a new home. It covers a rooftop solar system and battery storage.
How large is the solar system at 4424 Sacred Arrow Dr?
The April 25, 2025 permit lists a 10.2 kW rooftop solar system and 13.5 kW battery storage system.
What does permit 2025-038169 EP cover?
Filed April 1, 2025, the permit covers disconnecting and reconnecting power to tie in the solar and energy storage components, and installing a backup switch rated up to 200 amps.
Is the electrical service being upgraded at 4424 Sacred Arrow Dr?
No service-size or meter-size upgrade is described in permit 2025-038169 EP. The permit says the work does not upgrade either size.
Are the permits for the solar installation final?
Both City of Austin electrical permits, 2025-038134 EP and 2025-038169 EP, are listed with final status.
Also being built nearby
All of 78735- 4410 Eagles Landing DrAug 28, 2024Replacement of an existing water heater · 68 m away
- 4408 Sacred Arrow DrSep 5, 2024Install level 2 ev charger · 78 m away
- 4441 Sacred Arrow DrDec 12, 2023Install new 5.22kw rooftop solar system and 13.5kw energy storage system for existing residential only. this is in addition to an existing solar system · 92 m away
- 4422 Eagles Landing DrDec 19, 2024Install irrigation system · 104 m away
- 4000 Eagles Landing CvMar 12, 2024Replacement of complete existing central heat and air system with or without duct work · 119 m away
- 4191 Travis Country CirMar 11, 202612 tunnel under concrete foundation to make repairs to pvc plumbing system · 152 m away
- 4305 Travis Country CirOct 15, 2026Replacement of complete existing central heat and air system with or without duct work · 197 m away
- 4202 Travis Country CirDec 26, 2023Replacement of complete existing central heat and air system with or without duct work · 198 m away
- 4190 Travis Country CirMar 3, 2025200a service upgrade: main service and panel replacement · 215 m away
- 4304 Travis Country CirFeb 26, 2026200amp panel 200amp meter grounding and bonding · 251 m away
- 4185 Travis Country CirJul 10, 2026Replacement of complete existing central heat and air system with or without duct work · 257 m away
- 4614 Trail Crest CirAug 6, 2024Replacing panel due to sylvania · 260 m away
More warehouses & industrial in 78735, solar installs in 78735.