4609 Amarra Dr
Austin, TX 78735
4609 Amarra Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 4609 Amarra Dr, Austin, TX 78735. The most recent, filed January 24, 2008, covers: “Amarra drive, phase 2”.
Compiled from City of Austin records · updated Jan 24, 2008
- Projects
- 1
- 1 filings
- Latest filing
- Jan 24, 2008
- since Jan 24, 2008
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 4609 Amarra Dr
What is being built at 4609 Amarra Dr?
The latest filing (City of Austin case 10025014, January 24, 2008) covers amarra drive, phase 2.
How many permits and filings does 4609 Amarra Dr have?
1 filing across 1 project, from January 24, 2008 to January 24, 2008.
Is there other construction near 4609 Amarra Dr?
Yes. Nearby filings include 4700 Amarra Dr (installing ats for 48 kw kohler generator installing new underground feed from meter to ats installing feeder from ats back to overhead gutter to supply existing 200a main breaker panel and 150a block breaker **requesting 1 day shut down** *disconnect and reconnect only [etj], Jul 17, 2026); 4401 Amarra Dr (disconnect and reconnect only - etj 26kw whole home generator, Sep 28, 2026); 4320-1/2 Amarra Dr (travis county mud no. 4 amarra drive odor control unit, Jul 23, 2025).
How do I get alerts for new permits at 4609 Amarra Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78735- 4700 Amarra DrJul 17, 2026Installing ats for 48 kw kohler generator installing new underground feed from meter to ats installing feeder from ats back to overhead gutter to supply existing 200a main breaker panel and 150a block breaker **requesting 1 day shut down** *disconnect and reconnect only [etj] · 157 m away
- 4401 Amarra DrSep 28, 2026Disconnect and reconnect only - etj 26kw whole home generator · 318 m away
- 4320-1/2 Amarra DrJul 23, 2025Travis county mud no. 4 amarra drive odor control unit · 343 m away
- 4320 Amarra DrNov 5, 2024New construction in the etj sfr · 345 m away
- 4801 Amarra DrAug 1, 2025Install new 12.90 kw dc rooftop solar system and 40.5 kwh energy storage system to new addition on existing residential · 358 m away
- 4800 Amarra DrJun 1, 2012Amarra drive, phase 3 · 364 m away
- 4316 Amarra DrApr 29, 2024New construction electrical 3000 sq ft etj · 364 m away
- 4312 Amarra DrJun 7, 2024New construction electrical 3500 sq ft etj · 388 m away
- 4825 Amarra DrMay 1, 2018Amarra drive phase 3 amended plat of lots 15 & 16 block h · 390 m away
- 4308 Amarra DrMar 11, 2025Etj new service for sfr · 428 m away
- 4304 Amarra DrMay 27, 2025350 amp service etj new service for sfr · 453 m away
- 4408 Amarra DrAug 18, 2026350 amp etj new service for sfr · 472 m away