5101 Split Cedar Cv
Austin, TX 78735
5101 Split Cedar Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 5101 Split Cedar Cv, Austin, TX 78735. The most recent, filed March 4, 2024, covers: “Addition to existing 1-story single family residential to include: rear covered screened patio”.
Compiled from City of Austin records · updated Mar 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 4, 2024
- since Mar 4, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectAddition to existing 1-story single family residential to include: rear covered screened patio
Addition to existing 1-story single family residential to include: rear covered screened patio
City of Austin permitBuilding PermitExpired- Record
- 2024-025954 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5101 Split Cedar Cv
What is being built at 5101 Split Cedar Cv?
The latest filing (City of Austin permit 2024-025954 BP, March 4, 2024) covers addition to existing 1-story single family residential to include: rear covered screened patio.
How many permits and filings does 5101 Split Cedar Cv have?
1 filing across 1 project, from March 4, 2024 to March 4, 2024.
Is there other construction near 5101 Split Cedar Cv?
Yes. Nearby filings include 5105 Split Cedar Cv (the project involves replacing the existing waste line that runs from the house to the citys sewer tie-in. this is a crucial task that requires the careful removal and replacement of the current waste line infrastructure to ensure proper drainage and waste management. over time waste lines can degrade due to factors such as wear and tear tree root intrusion shifting ground or pipe corrosion leading to potential blockages or leaks. in this case the waste line needs to be fully replaced to ensure that the connection between the house and the citys main sewer system functions efficiently and complies with local plumbing codes and regulations. the process of changing out the waste line begins with a thorough inspection of the existing system. this involves assessing the current pipe condition identifying any issues like cracks leaks or clogs and determining the best course of action for replacement. in some cases it may also be necessary to conduct soil tests to assess ground conditions before excavation work begins. once the assessment is complete a team of licensed plumbers and excavation specialists will begin the process of digging up the old waste line carefully extracting it and laying down a new durable pipe that meets modern standards for waste management. this new pipe will be securely connected to the houses plumbing system at one end and to the citys sewer system at the other ensuring an airtight and reliable connection. the installation will also include checks for proper slope and alignment as waste lines must maintain a specific gradient to allow for the efficient flow of wastewater. after the new pipe is installed the trench will be backfilled and the surrounding area restored to its original condition.in addition to improving the functionality of the plumbing system this project will help prevent potential health hazards water damage and environmental risks caused by leaks or blockages in the old waste line, Feb 3, 2025); 4416 Twisted Tree Dr (village park ii at travis country — village park ii at travis country, Mar 2, 2007); 5104 Split Cedar Cv (gas work for home standby generator, Jun 30, 2025).
How do I get alerts for new permits at 5101 Split Cedar Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78735- 5105 Split Cedar CvFeb 3, 2025The project involves replacing the existing waste line that runs from the house to the citys sewer tie-in. this is a crucial task that requires the careful removal and replacement of the current waste line infrastructure to ensure proper drainage and waste management. over time waste lines can degrade due to factors such as wear and tear tree root intrusion shifting ground or pipe corrosion leading to potential blockages or leaks. in this case the waste line needs to be fully replaced to ensure that the connection between the house and the citys main sewer system functions efficiently and complies with local plumbing codes and regulations. the process of changing out the waste line begins with a thorough inspection of the existing system. this involves assessing the current pipe condition identifying any issues like cracks leaks or clogs and determining the best course of action for replacement. in some cases it may also be necessary to conduct soil tests to assess ground conditions before excavation work begins. once the assessment is complete a team of licensed plumbers and excavation specialists will begin the process of digging up the old waste line carefully extracting it and laying down a new durable pipe that meets modern standards for waste management. this new pipe will be securely connected to the houses plumbing system at one end and to the citys sewer system at the other ensuring an airtight and reliable connection. the installation will also include checks for proper slope and alignment as waste lines must maintain a specific gradient to allow for the efficient flow of wastewater. after the new pipe is installed the trench will be backfilled and the surrounding area restored to its original condition.in addition to improving the functionality of the plumbing system this project will help prevent potential health hazards water damage and environmental risks caused by leaks or blockages in the old waste line · 50 m away
- 4416 Twisted Tree DrMar 2, 2007Village park ii at travis country — village park ii at travis country · 59 m away
- 5104 Split Cedar CvJun 30, 2025Gas work for home standby generator · 76 m away
- 4414 Twisted Tree DrJul 29, 2026Repair to faulty electrical panel · 88 m away
- 4505 Twisted Tree DrJan 2, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system · 89 m away
- 5106 Split Cedar CvApr 24, 2026Express: removing and replacing 5 windows. like for like in existing residential home · 91 m away
- 4406 Mesquite Spring CvOct 29, 2026Construct new driveway approach of 18 ft · 96 m away
- 4404 Mesquite Spring CvFeb 24, 2026I would like to upgrade a service and meter to 200 amps. the homeowner is requesting a panel change and upgrade to accommodate for an electric car charger · 97 m away
- 4507 Twisted Tree DrOct 20, 2026Replacement of complete existing central heat and air system with or without duct work · 112 m away
- 4400 Mesquite Spring CvSep 4, 2024Upgrade main electric service to 200 amps · 131 m away
- 4909 Trail West DrJun 4, 2026Replacement of an existing water heater navien 240 s2 tankless water heater. change out 4909 trail west drive austin tx 78735 **tankless to tankless · 133 m away
- 4410 Twisted Tree DrDec 4, 2023Rebuild service · 141 m away
More new homes in 78735.