4505 Twisted Tree Dr
Austin, TX 78735
HVAC system replacement permitted at 4505 Twisted Tree Dr
A permit indicates replacement of the existing central heating and air system at this Austin residence, with a 3-ton horizontal gas system. The City of Austin permit was filed on January 2, 2026, and its status is expired.
Summarized from City of Austin records · updated Jan 2, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 2, 2026
- since Jan 2, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system
- AppliedJan 2, 2026
- IssuedJan 2, 2026
- !WorkJan '26 – Jul '26
- Final inspection
Marked expired Jul 20, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system
Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system
City of Austin permitMechanical PermitExpired- Record
- 2026-000069 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4505 Twisted Tree Dr
What is happening at 4505 Twisted Tree Dr?
A City of Austin mechanical permit lists replacement of the existing central heat and air system with a 3-ton horizontal gas system. The permit was filed January 2, 2026.
Is a new home being built at 4505 Twisted Tree Dr?
The listed permit is for replacing the existing heating and air system, not for new home construction.
What kind of HVAC system is being installed at 4505 Twisted Tree Dr?
The permit describes a 3-ton horizontal gas system, with or without duct work, as a like-for-like replacement.
When was the HVAC permit filed for 4505 Twisted Tree Dr?
The City of Austin filed permit 2026-000069 MP on January 2, 2026.
Is the permit for 4505 Twisted Tree Dr still active?
No. Permit 2026-000069 MP is listed with an expired status.
Also being built nearby
All of 78735- 4507 Twisted Tree DrOct 20, 2026Replacement of complete existing central heat and air system with or without duct work · 25 m away
- 4909 Trail West DrJun 4, 2026Replacement of an existing water heater navien 240 s2 tankless water heater. change out 4909 trail west drive austin tx 78735 **tankless to tankless · 65 m away
- 4406 Mesquite Spring CvOct 29, 2026Construct new driveway approach of 18 ft · 76 m away
- 5101 Split Cedar CvMar 4, 2024Addition to existing 1-story single family residential to include: rear covered screened patio · 89 m away
- 4404 Mesquite Spring CvFeb 24, 2026I would like to upgrade a service and meter to 200 amps. the homeowner is requesting a panel change and upgrade to accommodate for an electric car charger · 98 m away
- 5105 Split Cedar CvFeb 3, 2025The project involves replacing the existing waste line that runs from the house to the citys sewer tie-in. this is a crucial task that requires the careful removal and replacement of the current waste line infrastructure to ensure proper drainage and waste management. over time waste lines can degrade due to factors such as wear and tear tree root intrusion shifting ground or pipe corrosion leading to potential blockages or leaks. in this case the waste line needs to be fully replaced to ensure that the connection between the house and the citys main sewer system functions efficiently and complies with local plumbing codes and regulations. the process of changing out the waste line begins with a thorough inspection of the existing system. this involves assessing the current pipe condition identifying any issues like cracks leaks or clogs and determining the best course of action for replacement. in some cases it may also be necessary to conduct soil tests to assess ground conditions before excavation work begins. once the assessment is complete a team of licensed plumbers and excavation specialists will begin the process of digging up the old waste line carefully extracting it and laying down a new durable pipe that meets modern standards for waste management. this new pipe will be securely connected to the houses plumbing system at one end and to the citys sewer system at the other ensuring an airtight and reliable connection. the installation will also include checks for proper slope and alignment as waste lines must maintain a specific gradient to allow for the efficient flow of wastewater. after the new pipe is installed the trench will be backfilled and the surrounding area restored to its original condition.in addition to improving the functionality of the plumbing system this project will help prevent potential health hazards water damage and environmental risks caused by leaks or blockages in the old waste line · 114 m away
- 4403 Mesquite Spring CvJan 3, 2024Upgrade main electric service and install evse at garage · 115 m away
- 4905 Trail West DrMay 18, 2026Electrical upgrade · 117 m away
- 4400 Mesquite Spring CvSep 4, 2024Upgrade main electric service to 200 amps · 125 m away
- 4925 Trail West DrJun 18, 2025Request to disconnect - installing new service rated generac transfer switch and generator. this will require disconnecting and reconnecting power. the transfer switch will be placed between the meter and existing house panel. 150 amp service with 150 amp ats main panel replacement (150a) · 129 m away
- 4416 Twisted Tree DrMar 2, 2007Village park ii at travis country — village park ii at travis country · 137 m away
- 4903 Trail West DrApr 30, 2024Replacement of complete existing central heat and air system with or without duct work · 139 m away