4905 Trail West Dr
Austin, TX 78735
Permits for HVAC replacement and electrical upgrade
City of Austin permits indicate replacement of an existing central heating and air system at 4905 Trail West Dr, filed June 6, 2025. An electrical upgrade was filed May 18, 2026. Both permits are marked final.
Summarized from City of Austin records · updated May 18, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 18, 2026
- since Jun 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledElectrical upgrade
- AppliedMay 12, 2026
- IssuedMay 18, 2026
- WorkMay '26 – May '26
- Final inspectionMay 27, 2026
Passed final inspection May 27, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsElectrical upgrade
Electrical upgrade
City of Austin permitElectrical PermitFinal- Record
- 2026-059563 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-067820 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4905 Trail West Dr
What is happening at 4905 Trail West Dr?
City permits indicate replacement of an existing central heating and air system and an electrical upgrade. Both permits are marked final.
Is a new home being built at 4905 Trail West Dr?
The records provided do not show a new-home construction permit. They show permits for HVAC replacement and an electrical upgrade.
When was the HVAC replacement permitted at 4905 Trail West Dr?
The mechanical permit was filed June 6, 2025. Its permit number is 2025-067820 MP, and its status is final.
When was the electrical upgrade permitted at 4905 Trail West Dr?
The electrical permit was filed May 18, 2026. Its permit number is 2026-059563 EP, and its status is final.
What work does the HVAC permit cover at 4905 Trail West Dr?
It covers replacement of the complete existing central heat and air system, with or without duct work. The permit was filed June 6, 2025.
Also being built nearby
All of 78735- 4903 Trail West DrApr 30, 2024Replacement of complete existing central heat and air system with or without duct work · 24 m away
- 4909 Trail West DrJun 4, 2026Replacement of an existing water heater navien 240 s2 tankless water heater. change out 4909 trail west drive austin tx 78735 **tankless to tankless · 52 m away
- 4507 Twisted Tree DrOct 20, 2026Replacement of complete existing central heat and air system with or without duct work · 101 m away
- 4806-1/2 Trail West DrMay 16, 2019Aisd travis country tract impervious cover transfer project · 105 m away
- 4500 View WestSep 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton vertical dual fuel greenspeed · 110 m away
- 4505 Twisted Tree DrJan 2, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system · 117 m away
- 4502 View WestAug 13, 2025New pool and spa with uncovered wood deck and concreate patio · 123 m away
- 4601 View WestJul 30, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2 stage horizontal gas system · 170 m away
- 5105 Split Cedar CvFeb 3, 2025The project involves replacing the existing waste line that runs from the house to the citys sewer tie-in. this is a crucial task that requires the careful removal and replacement of the current waste line infrastructure to ensure proper drainage and waste management. over time waste lines can degrade due to factors such as wear and tear tree root intrusion shifting ground or pipe corrosion leading to potential blockages or leaks. in this case the waste line needs to be fully replaced to ensure that the connection between the house and the citys main sewer system functions efficiently and complies with local plumbing codes and regulations. the process of changing out the waste line begins with a thorough inspection of the existing system. this involves assessing the current pipe condition identifying any issues like cracks leaks or clogs and determining the best course of action for replacement. in some cases it may also be necessary to conduct soil tests to assess ground conditions before excavation work begins. once the assessment is complete a team of licensed plumbers and excavation specialists will begin the process of digging up the old waste line carefully extracting it and laying down a new durable pipe that meets modern standards for waste management. this new pipe will be securely connected to the houses plumbing system at one end and to the citys sewer system at the other ensuring an airtight and reliable connection. the installation will also include checks for proper slope and alignment as waste lines must maintain a specific gradient to allow for the efficient flow of wastewater. after the new pipe is installed the trench will be backfilled and the surrounding area restored to its original condition.in addition to improving the functionality of the plumbing system this project will help prevent potential health hazards water damage and environmental risks caused by leaks or blockages in the old waste line · 170 m away
- 5101 Split Cedar CvMar 4, 2024Addition to existing 1-story single family residential to include: rear covered screened patio · 179 m away
- 4406 Mesquite Spring CvOct 29, 2026Construct new driveway approach of 18 ft · 192 m away
- 4404 Mesquite Spring CvFeb 24, 2026I would like to upgrade a service and meter to 200 amps. the homeowner is requesting a panel change and upgrade to accommodate for an electric car charger · 215 m away