5209 Trading Bnd
Austin, TX 78735
Home HVAC replacement and Level 2 EV charger permits
Permits indicate work on the existing home at 5209 Trading Bnd: a central heating and air system replacement was permitted on May 20, 2025, followed by a Level 2 EV charger installation permit on July 7, 2026. Both permits are listed as final.
Summarized from City of Austin records · updated Jul 7, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 7, 2026
- since May 20, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedJul 3, 2026
- IssuedJul 7, 2026
- WorkJul '26 – Jan '27
- Final inspectionJul 8, 2026
Passed final inspection Jul 8, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-085527 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-060142 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5209 Trading Bnd
What is being built at 5209 Trading Bnd in Austin?
The permits indicate upgrades to an existing home: replacement of its central heating and air system and installation of a Level 2 EV charger. They do not describe a new building.
Is a new home being built at 5209 Trading Bnd?
The records provided list permits for HVAC replacement and an EV charger, not new home construction.
Is an EV charger being installed at 5209 Trading Bnd?
Yes. A City of Austin permit for a Level 2 EV charger was filed July 7, 2026 (permit 2026-085527 EP); its status is final.
What HVAC work is permitted at 5209 Trading Bnd?
A City of Austin mechanical permit filed May 20, 2025, covers replacement of the existing central heat and air system, with or without duct work. The permit is listed as final.
Are the permits at 5209 Trading Bnd complete?
Both listed City of Austin permits have final status: the mechanical permit from May 20, 2025, and the electrical permit from July 7, 2026.
Also being built nearby
All of 78735- 5205 Trading BndMar 11, 2024Replacement of complete existing central heat and air system with or without duct work · 24 m away
- 5204 Trading BndOct 9, 2025Replacement of an existing water heater heat pump · 48 m away
- 5208 Trading BndFeb 17, 2025Replacement of complete existing central heat and air system with or without duct work replace 3 ton gas system with new basic seer2 goodman. new gsxn4 condenser coil and gm9s furnace on puron refrigerant. remove and dispose of old equipment. new ecobee3 wifi thermostat · 49 m away
- 5212 Trading BndFeb 5, 2024Replace 125a exterior panel & meter base with new 200a panel & meter base · 58 m away
- 5200 Trading BndApr 7, 2025(lee mike) - installation of circuit for elec. vehicle charging station - esip · 60 m away
- 5900 Republic Of Texas BlvdJan 5, 2025Replacement of an existing water heater · 64 m away
- 4301 Painted Pony CvApr 22, 2024Addition and interior remodel · 103 m away
- 4200 Sun Spirit DrMay 11, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 109 m away
- 5216 Crystal Water DrNov 3, 2025Tunnel under foundation and repair root entrusion on a 3 inch pvc drain line · 117 m away
- 5220 Crystal Water DrAug 19, 2025Replacement of an existing water heater · 120 m away
- 4209 Sun Spirit DrJul 25, 2025Replacement of complete existing central heat and air system with or without duct work · 121 m away
- 4309 Painted Pony CvSep 8, 2026Express: 23 windows replacement no structural changes · 121 m away