5611 Oak Blvd
Austin, TX 78735
5611 Oak Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 5611 Oak Blvd, Austin, TX 78735. The most recent, filed January 21, 2022, covers: “Oak acres amended plat”.
Compiled from City of Austin records · updated Jan 21, 2022
- Projects
- 1
- 1 filings
- Latest filing
- Jan 21, 2022
- since Jan 21, 2022
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 5611 Oak Blvd
What is being built at 5611 Oak Blvd?
The latest filing (City of Austin case 11936694, January 21, 2022) covers oak acres amended plat.
How many permits and filings does 5611 Oak Blvd have?
1 filing across 1 project, from January 21, 2022 to January 21, 2022.
Is there other construction near 5611 Oak Blvd?
Yes. Nearby filings include 5609 S Oak Blvd (adding a solar pv rooftop system to an existing residence, Dec 16, 2024); 5620 S Oak Blvd (ev charger and can light (ceiling light), Jun 10, 2025); 5605 S Oak Blvd (replacement of complete existing central heat and air system with or without duct work, Jul 13, 2026).
How do I get alerts for new permits at 5611 Oak Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78735- 5609 S Oak BlvdDec 16, 2024Adding a solar pv rooftop system to an existing residence · 29 m away
- 5620 S Oak BlvdJun 10, 2025Ev charger and can light (ceiling light) · 91 m away
- 5605 S Oak BlvdJul 13, 2026Replacement of complete existing central heat and air system with or without duct work · 120 m away
- 5640 W Oak BlvdAug 6, 2025Request to disconnect - replace existing outdated 200amp 40 ckt main breaker panel with new 200amp 42 ckt main breaker panel and add additional supplemental grounding and surge protection · 124 m away
- 5642-1/2 Oak BlvdOct 17, 2023Barton creek - oak acres flood risk reduction project · 147 m away
- 5601 S Oak BlvdAug 31, 2026Repipe drain lines for 2 full bathrooms kitchen and washer under pier and beam foundation total length of drain line is approximately 40 feet and reroute drain lines to the right side of the home. replace sewer line from the home to the city tap connection with length of approximately 60 feet · 148 m away
- 5673 Oak BlvdApr 29, 2026Replace sewer yard line from house connection to city tap · 155 m away
- 5645 W Oak BlvdAug 7, 2024Expose and repair broken sewer piping with an access tunnel · 157 m away
- 5677 Oak BlvdApr 29, 2026Replace sewer yard line from property connection to city tap · 186 m away
- 5838 US 290 HwyNov 25, 2018Public employees credit union · 201 m away
- 5820 Harper Park DrNov 6, 2026Base: installing a backup battery system and additional meter socket · 230 m away
- 5652 N Oak BlvdMay 14, 2026Emergency upgrade of service after damaged from storm · 251 m away