In-ground pool permitted at 6009 Kelsing Cv
Permits indicate an in-ground swimming pool with a concrete deck, spa, coping and equipment pad at 6009 Kelsing Cv. The City of Austin issued building, electrical and plumbing permits between August 11 and October 7, 2025; all three are marked final.
Summarized from City of Austin records · updated Oct 7, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Oct 7, 2025
- since Aug 11, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledPool - installation of an in-ground swimming pool with a new concrete deck spa pool coping and equipment pad
- AppliedApr 7, 2025
- IssuedOct 7, 2025
- WorkOct '25 – Dec '25
- Final inspectionDec 19, 2025
Passed final inspection Dec 19, 2025.
1 contact on this project · 1 phone number
Permit & project history
3 projectsPool - installation of an in-ground swimming pool with a new concrete deck spa pool coping and equipment pad
Pool - installation of an in-ground swimming pool with a new concrete deck spa pool coping and equipment pad
City of Austin permitPlumbing PermitFinal- Record
- 2025-098578 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Pool - installation of an in-ground swimming pool with a new concrete deck spa pool coping and equipment pad
Pool - installation of an in-ground swimming pool with a new concrete deck spa pool coping and equipment pad
City of Austin permitElectrical PermitFinal- Record
- 2025-098578 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Pool - installation of an in-ground swimming pool with a new concrete deck spa pool coping and equipment pad
Pool - installation of an in-ground swimming pool with a new concrete deck spa pool coping and equipment pad
City of Austin permitBuilding PermitFinal- Record
- 2025-098578 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6009 Kelsing Cv
What is being built at 6009 Kelsing Cv?
City of Austin permits indicate an in-ground swimming pool with a concrete deck, spa, coping and equipment pad.
When was the pool at 6009 Kelsing Cv permitted?
The building permit was filed August 11, 2025, followed by an electrical permit on September 4 and a plumbing permit on October 7, 2025.
What are the permit numbers for the pool at 6009 Kelsing Cv?
The permits are 2025-098578 BP for building, 2025-098578 EP for electrical and 2025-098578 PP for plumbing.
Are the pool permits at 6009 Kelsing Cv final?
Yes. The City of Austin lists the building, electrical and plumbing permits as final.
Is a new pool planned for 6009 Kelsing Cv in Austin?
Permits filed in 2025 describe installation of an in-ground swimming pool, along with a concrete deck, spa, coping and equipment pad.
Also being built nearby
All of 78735- 6013 Kelsing CvJan 3, 2024Replacement of furnace only · 23 m away
- 6012 Kelsing CvApr 11, 2024Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 6013 Terravista DrJul 21, 2026Plug for tankless water heater · 86 m away
- 7816 Journeyville DrNov 12, 2025Replacement of an existing water heater · 86 m away
- 5821 Kempson DrApr 14, 2025Replacement of an existing water heater standard 40 gal natural gas water heater change out · 100 m away
- 6016 Kelsing CvFeb 16, 2024Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 7804 Journeyville DrMay 29, 2024Replacement of an existing water heater · 106 m away
- 7904 Journeyville DrAug 28, 2025Replacement of an existing water heater change out: install/ replace 40 gallon tank-type natural gas water heater · 106 m away
- 5808 Kempson DrAug 28, 2026Install level 2 ev charger · 115 m away
- 5817 Kempson DrJun 13, 2024Replacement of complete existing central heat and air system with or without duct work · 115 m away
- 5813 Kempson DrAug 11, 2025Replacement of complete existing central heat and air system with or without duct work residential full changeout (4ton-gas-14s-ss--no ducts) · 130 m away
- 6005 Terravista DrAug 29, 2025Replacement of complete existing central heat and air system with or without duct work · 132 m away