groundranger
Active · latest filing Sep 2026Residential

6208 Soter Pkwy

Austin, TX 78735

Electrical permits cover an EV charger and backup battery

City of Austin permits at 6208 Soter Pkwy cover a Level 2 EV charger and a backup battery system with an additional meter socket. The EV charger permit was filed October 17, 2025, and is final; the battery system permit was filed September 22, 2026, and is active.

Summarized from City of Austin records · updated Sep 22, 2026

Projects
2
2 filings
Latest filing
Sep 22, 2026
since Oct 17, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Base: installing a backup battery system and additional meter socket

  1. AppliedSep 10, 2026
  2. IssuedSep 22, 2026
  3. WorkSep '26 – Mar '27
  4. Final inspection
32% through of the permit windowSep 22, 2026 → Mar 21, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Base: installing a backup battery system and additional meter socket

    Base: installing a backup battery system and additional meter socket

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install level 2 ev charger

    Install level 2 ev charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6208 Soter Pkwy

What work is permitted at 6208 Soter Pkwy?

Austin permit records show a Level 2 EV charger and a backup battery system with an additional meter socket.

Is a new EV charger being installed at 6208 Soter Pkwy?

A City of Austin electrical permit filed October 17, 2025, covers installation of a Level 2 EV charger. The permit is final.

Is there a permit for a backup battery at 6208 Soter Pkwy?

Yes. Permit 2026-119320 EP covers installation of a backup battery system and an additional meter socket. It was filed September 22, 2026, and is active.

What is the status of the battery system permit at 6208 Soter Pkwy?

The City of Austin lists permit 2026-119320 EP as active. It was filed September 22, 2026.

When was the EV charger permit filed at 6208 Soter Pkwy?

Permit 2025-131721 EP was filed October 17, 2025, for a Level 2 EV charger. Its status is final.

Also being built nearby

All of 78735
Email me when it passes final inspection