6501 William Cannon Dr
Austin, TX 78735
Site plan approved for Motorola Oak Hill hydrogen facilities
A site plan for hydrogen peroxide and liquid hydrogen facilities at the Motorola Oak Hill site was approved and released by the City of Austin on Aug. 13, 2024. The city record identifies the project as case 10013274; it does not provide a construction area or project cost.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Aug 13, 2024
- Projects
- 18
- 18 filings
- Latest filing
- Aug 13, 2024
- since Mar 2, 2007
- Largest scope
- —
- Estimated cost
- $1.5M
- state registration
Where this project stands
CompletedNXP Smart Home Innovation
5,717 sq ft · $1.5M est.
- RegisteredJul 5, 2023
- Plan review
- ConstructionJul '23 – Nov '23
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
18 projectsInterior renovation to existing space — nxp f building
TDLR project registrationRenovation/AlterationProject Closed5,717 sq ft$1.5M est.- Project #
- TABS2023022849
- Tenant / owner
- Nxp Smart Home Innovation
- Design firm
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 6501 William Cannon Dr
What is being built at 6501 William Cannon Dr?
A City of Austin site plan identifies hydrogen peroxide and liquid hydrogen facilities at the Motorola Oak Hill site. Case 10013274 was approved and released on Aug. 13, 2024.
Was the Motorola Oak Hill hydrogen facilities project approved?
Yes. The City of Austin lists site plan case 10013274 as approved and released on Aug. 13, 2024.
When was the latest project filed at 6501 William Cannon Dr?
The latest listed filing is dated Aug. 13, 2024, for the Motorola Oak Hill hydrogen peroxide and liquid hydrogen facilities site plan, case 10013274.
Is there a project cost or building size for the hydrogen facilities?
The available record does not list a square footage or project valuation for case 10013274.
What other recent work is listed at this address?
A City of Austin site plan for an NXP bulk loading HCL shelter was approved and released on April 8, 2022, under case 12820414.
Does the address have older Motorola project records?
Yes. City records include 2007 site plans for office and manufacturing additions, cafeteria work, Building C and Building J, and east parking area phases 3 and 4.
Also being built nearby
All of 78735- 6501 W William Cannon Dr · Nxp Usa INCDec 1, 2025Provide additional power for f2541. provide and install 2-new 2pole 15a breakers in panel fp47. provide and install a 30a non-fused disconnect. provide and install 3kva transformer to feed wiremold along with 3-1 pole 20a breakers and 2 -10-20r receptacles · 12 m away
- 6705 US 290 HwySep 15, 2015Detour bar & grill · 284 m away
- 6306 William Cannon DrSep 10, 2019William cannon retail with r sp-2017-0189c · 335 m away
- 6501 US 290 HwyOct 18, 2010Mccarty oaks revision · 343 m away
- 6406 Wolfcreek PassNov 21, 2024Need to schedule outage to upgrade from a single 200 a meter to a 320a meter on main house need to disconnect power remove existing meter and rebuild a new meter loop meter loop to serve existing house and new adu adu permit number 2024-089385 ep · 357 m away
- 6812 Kenosha PassMar 25, 2025Express: install 346 sq ft of vapor barrier and 1 dehumidifier · 360 m away
- 6503 Wolfcreek PassJan 10, 2025Remove existing deck attached to the second floor of house. replace deck and add additional 80 square feet · 379 m away
- 6507 Wolfcreek PassOct 23, 2025Replacement of complete existing central heat and air system with or without duct work · 385 m away
- 6516 Wolfcreek PassSep 3, 202422kw whole home generator (liquid propane) connected to subpanel down stream from main disconnect. ae disconnect will not be required. (jack brown) · 390 m away
- 6816 Kenosha PassSep 23, 2025Replacement of complete existing central heat and air system with or without duct work · 392 m away
- 6513 Wolfcreek PassMar 18, 2025Replacement of complete existing central heat and air system with or without duct work · 393 m away
- 6811 Kenosha PassDec 12, 2025Replacement of complete existing central heat and air system with or without duct work **heat pump not gas unit · 401 m away
More warehouses & industrial in 78735, offices in 78735, parking structures in 78735.