7509 Bonniebrook Dr
Austin, TX 78735
Electrical panel replacement permitted at 7509 Bonniebrook Dr
A main electrical panel replacement is permitted at 7509 Bonniebrook Dr in Austin. The City of Austin issued the active electrical permit on May 27, 2026; permit number 2026-064592 EP.
Summarized from City of Austin records · updated May 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 27, 2026
- since May 27, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayMain panel replacement
- AppliedMay 21, 2026
- IssuedMay 27, 2026
- WorkMay '26 – Nov '26
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectMain panel replacement
Main panel replacement
City of Austin permitElectrical PermitActive- Record
- 2026-064592 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7509 Bonniebrook Dr
What work is permitted at 7509 Bonniebrook Dr?
The City of Austin permit describes a main electrical panel replacement. It does not indicate new construction.
When was the electrical permit issued for 7509 Bonniebrook Dr?
The permit was filed on May 27, 2026.
What is the permit number for 7509 Bonniebrook Dr?
The City of Austin permit number is 2026-064592 EP.
Is the permit for 7509 Bonniebrook Dr active?
Yes. The City of Austin record lists the electrical permit as active.
Is a new home being built at 7509 Bonniebrook Dr?
The record describes a main panel replacement, not a new home.
Also being built nearby
All of 78735- 7513 Bonniebrook DrDec 10, 2024Replacement of an existing water heater · 20 m away
- 5912 Terravista DrAug 1, 2025Replacement of complete existing central heat and air system with or without duct work · 75 m away
- 5728 Walser CvNov 17, 2023New pool and spa · 94 m away
- 7528 Bonniebrook DrMay 8, 2025Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 7412 Journeyville DrAug 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 5 ton two stage horizontal gas system · 104 m away
- 7408 Journeyville DrJul 29, 2024Replacement of an existing water heater/40-gal gas water heater · 107 m away
- 5721 Walser CvOct 28, 2024Replacement of an existing water heater · 109 m away
- 7428 Bonniebrook DrJul 11, 2024Express replace 1 existing window · 119 m away
- 5909 Terravista DrJan 9, 2026Excavate 15 tunnel to repair main drain line under house · 121 m away
- 5921 Terravista DrDec 13, 2023Replacement of an existing water heater · 129 m away
- 5720 Walser CvAug 26, 2026Replacement of an existing water heater 40 gallon natural gas water heater replacement · 130 m away
- 5813 Kempson DrAug 11, 2025Replacement of complete existing central heat and air system with or without duct work residential full changeout (4ton-gas-14s-ss--no ducts) · 140 m away