groundranger
Recent · latest filing Jul 2026Residential

7009 Bright Star Ln

Austin, TX 78736

6.8-kW rooftop solar system permitted at Austin home

A City of Austin electrical permit filed July 28, 2026, covers installation of a 6.8-kW rooftop solar system at an existing residence. Permit 2026-090829 EP is marked Final.

Summarized from City of Austin records · updated Jul 28, 2026

Projects
1
1 filings
Latest filing
Jul 28, 2026
since Jul 28, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Maline 39-83745 - install new _6.8__kw rooftop solar system to existing residential only using line side tap only

  1. AppliedJul 14, 2026
  2. IssuedJul 28, 2026
  3. WorkJul '26 – Aug '26
  4. Final inspectionAug 21, 2026

Passed final inspection Aug 21, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Maline 39-83745 - install new _6.8__kw rooftop solar system to existing residential only using line side tap only

    Maline 39-83745 - install new _6.8__kw rooftop solar system to existing residential only using line side tap only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7009 Bright Star Ln

What is being built at 7009 Bright Star Ln?

A City of Austin permit covers a new 6.8-kW rooftop solar system at the existing residence. The permit was filed July 28, 2026.

Is a new home being built at 7009 Bright Star Ln?

The permit describes a solar installation at an existing residence, not construction of a new home. It is City of Austin permit 2026-090829 EP.

When was the solar permit filed at 7009 Bright Star Ln?

The City of Austin filed electrical permit 2026-090829 EP on July 28, 2026. Its status is listed as Final.

How large is the solar system planned for 7009 Bright Star Ln?

The permit describes a 6.8-kW rooftop solar system. It does not list a project valuation.

Is the solar system at 7009 Bright Star Ln already installed?

The permit record covers installation of the system and is marked Final. The record does not separately confirm when installation was completed.

Also being built nearby

All of 78736

More solar installs in 78736.

Email me when a new permit is filed