groundranger
Historic · latest filing Feb 2024Residential

7108 Harvest Trail Dr

Austin, TX 78736

7108 Harvest Trail Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 7108 Harvest Trail Dr, Austin, TX 78736. The most recent, filed February 16, 2024, covers: “Tunnel below the foundation to spot repair drain line”.

Compiled from City of Austin records · updated Feb 16, 2024

Projects
1
1 filings
Latest filing
Feb 16, 2024
since Feb 16, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Tunnel below the foundation to spot repair drain line

  1. AppliedFeb 2, 2024
  2. IssuedFeb 16, 2024
  3. WorkFeb '24 – Mar '24
  4. Final inspectionMar 13, 2024

Passed final inspection Mar 13, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Tunnel below the foundation to spot repair drain line

    Tunnel below the foundation to spot repair drain line

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7108 Harvest Trail Dr

What is being built at 7108 Harvest Trail Dr?

The latest filing (City of Austin permit 2024-013330 PP, February 16, 2024) covers tunnel below the foundation to spot repair drain line.

How many permits and filings does 7108 Harvest Trail Dr have?

1 filing across 1 project, from February 16, 2024 to February 16, 2024.

Is there other construction near 7108 Harvest Trail Dr?

Yes. Nearby filings include 7106 Harvest Trail Dr (interior remodel/garage conversion - remove closet in livingroom and align new walls remodel kitchen cabinets and pantry. relocate kitchen cabinets. remodel the bathroom and remove cornered space within the powder room and align the new wall. relocate water heater demolition closet and water heater closet. relocate washer and dryer. remove cabinets in laundry and align new wall, May 20, 2025); 7107 Dunkirk Dr (install new 9.49kw rooftop solar system to existing residential only using a backfed breaker, Dec 17, 2025); 7207 Scenic Brook Dr (we will dig up the existing collapsed 3â� sdr sewer line and replace it with new 3â� schedule 40 pvc. we will install a clean out near the house to allow for access to the sewer line in the future, Jan 8, 2024).

How do I get alerts for new permits at 7108 Harvest Trail Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78736
Email me when a new permit is filed