groundranger
Recent · latest filing Apr 2026Residential

7715 Crackling Creek Dr

Austin, TX 78736

EV charging circuit and HVAC permits at 7715 Crackling Creek Dr

City of Austin records show a permit for an electrical circuit for an EV charging station at this residence, filed April 21, 2026. An earlier permit, filed May 29, 2024, covered replacement of the existing central heating and air system.

Summarized from City of Austin records · updated Apr 21, 2026

Projects
2
2 filings
Latest filing
Apr 21, 2026
since May 29, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

(reneau jp) - installation of circuit for elec. vehicle charging station - esip

  1. AppliedApr 16, 2026
  2. IssuedApr 21, 2026
  3. WorkApr '26 – May '26
  4. Final inspectionMay 27, 2026

Passed final inspection May 27, 2026.

1 contact on this project

Permit & project history

2 projects
  1. (reneau jp) - installation of circuit for elec. vehicle charging station - esip

    (reneau jp) - installation of circuit for elec. vehicle charging station - esip

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7715 Crackling Creek Dr

What is being built at 7715 Crackling Creek Dr?

The records show home improvement work, not a new building: an electrical circuit for an EV charging station and replacement of the existing central HVAC system.

Is an EV charger being installed at 7715 Crackling Creek Dr?

A City of Austin electrical permit describes installation of a circuit for an electric vehicle charging station. It was filed April 21, 2026, under permit 2026-046991 EP.

When was the EV charging permit filed?

The electrical permit for the charging-station circuit was filed April 21, 2026. Its status is listed as Final.

Was a new HVAC system permitted at this address?

Yes. A mechanical permit filed May 29, 2024, covered replacement of the complete existing central heat and air system, with or without duct work. Permit 2024-066800 MP is listed as Final.

Is this a new residential development?

The listed permits concern work at a residence: HVAC system replacement and an electrical circuit for an EV charging station. The records provided do not show a new residential development.

Also being built nearby

All of 78736
Email me when a new permit is filed