8403 Moccasin Path
Austin, TX 78736
8403 Moccasin Path: 1 project on record
City of Austin lists 1 filing across 1 project at 8403 Moccasin Path, Austin, TX 78736. The most recent, filed September 4, 2024, covers: “Replace existing 200a meter loop and interior panel with new 200a meter loop exterior feed through panel and interior panel”.
Compiled from City of Austin records · updated Sep 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 4, 2024
- since Sep 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace existing 200a meter loop and interior panel with new 200a meter loop exterior feed through panel and interior panel
- AppliedAug 27, 2024
- IssuedSep 4, 2024
- WorkSep '24 – Oct '24
- Final inspectionOct 1, 2024
Passed final inspection Oct 1, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace existing 200a meter loop and interior panel with new 200a meter loop exterior feed through panel and interior panel
Replace existing 200a meter loop and interior panel with new 200a meter loop exterior feed through panel and interior panel
City of Austin permitElectrical PermitFinal- Record
- 2024-109740 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8403 Moccasin Path
What is being built at 8403 Moccasin Path?
The latest filing (City of Austin permit 2024-109740 EP, September 4, 2024) covers replace existing 200a meter loop and interior panel with new 200a meter loop exterior feed through panel and interior panel.
How many permits and filings does 8403 Moccasin Path have?
1 filing across 1 project, from September 4, 2024 to September 4, 2024.
Is there other construction near 8403 Moccasin Path?
Yes. Nearby filings include 8309 Moccasin Path (new detached covered concrete patio, Dec 10, 2024); 7100 Smokey Hill Rd (replacement of complete existing central heat and air system with or without duct work, Sep 26, 2024); 8306 Moccasin Path (replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal heat pump system, May 7, 2025).
How do I get alerts for new permits at 8403 Moccasin Path?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78736- 8309 Moccasin PathDec 10, 2024New detached covered concrete patio · 62 m away
- 7100 Smokey Hill RdSep 26, 2024Replacement of complete existing central heat and air system with or without duct work · 67 m away
- 8306 Moccasin PathMay 7, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal heat pump system · 80 m away
- 8307 Moccasin PathFeb 13, 2025Electrical connection from house to new backyard shed as an office space via sub panel. the office will consist of electrical outlets and lights. shed is 192 square feet. upgrade the existing main panel and meter - 200 amp over head service · 99 m away
- 8309 Red Willow DrJan 8, 2025Express: cosmetic remodel changing valves in bathrooms new cabinets in kitchen new countertops new paint light landscaping new doors new flooring servicing hvac · 106 m away
- 8406 Red Willow DrDec 5, 2023Express: replace 8 existing windows · 111 m away
- 7203 Smokey Hill RdSep 27, 2024Replacement of complete existing central heat and air system with or without duct work · 120 m away
- 8305 Moccasin PathApr 18, 2024Construct new driveway approach of 20 ft · 125 m away
- 8305 Red Willow DrDec 11, 2023Express window replacement (size for size replacement) · 127 m away
- 7202 Smokey Hill RdMay 8, 2026Upon inspection of the sewer line three separate root intrusions were identified between the home and the city tap indicating multiple points of failure throughout the system. given the overall condition of the line we recommend a full replacement of the sewer line from the home to the city connection approximately 40 feet in length to provide a long-term solution and prevent recurring issues. our scope of work includes full excavation from the home to the city tap removal of the existing damaged sewer line and installation of new piping for the entire run. this will eliminate all root intrusion points and restore proper flow throughout the system. all new piping will be properly bedded in sand to help prevent ground shifting and ensure long-term stability. upon completion we will perform backfill and restore the work area · 130 m away
- 8408 Red Willow DrJul 31, 2024Replacement of complete existing central heat and air system with or without duct work · 131 m away
- 8410 Red Willow DrAug 27, 2024Replaced 12ft pf broken sewer pipe under slab · 148 m away