8407 Bargamin Dr
Austin, TX 78736
8407 Bargamin Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8407 Bargamin Dr, Austin, TX 78736. The most recent, filed June 16, 2025, covers: “Replacement of an existing water heater replacing 50gallon gas water heater”.
Compiled from City of Austin records · updated Jun 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 16, 2025
- since Jun 16, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater replacing 50gallon gas water heater
- AppliedJun 2, 2025
- IssuedJun 16, 2025
- WorkJun '25 – Jun '25
- Final inspectionJun 23, 2025
Passed final inspection Jun 23, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater replacing 50gallon gas water heater
Replacement of an existing water heater replacing 50gallon gas water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-068003 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8407 Bargamin Dr
What is being built at 8407 Bargamin Dr?
The latest filing (City of Austin permit 2025-068003 PP, June 16, 2025) covers replacement of an existing water heater replacing 50gallon gas water heater.
How many permits and filings does 8407 Bargamin Dr have?
1 filing across 1 project, from June 16, 2025 to June 16, 2025.
Is there other construction near 8407 Bargamin Dr?
Yes. Nearby filings include 8501 Bargamin Dr (water heater change out to exist. res. like for like, Nov 21, 2024); 7202 Smokey Hill Rd (upon inspection of the sewer line three separate root intrusions were identified between the home and the city tap indicating multiple points of failure throughout the system. given the overall condition of the line we recommend a full replacement of the sewer line from the home to the city connection approximately 40 feet in length to provide a long-term solution and prevent recurring issues. our scope of work includes full excavation from the home to the city tap removal of the existing damaged sewer line and installation of new piping for the entire run. this will eliminate all root intrusion points and restore proper flow throughout the system. all new piping will be properly bedded in sand to help prevent ground shifting and ensure long-term stability. upon completion we will perform backfill and restore the work area, May 8, 2026); 8507 Bargamin Dr (addition and remodel extending dinning room and remodel of kitchen, Sep 29, 2026).
How do I get alerts for new permits at 8407 Bargamin Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78736- 8501 Bargamin DrNov 21, 2024Water heater change out to exist. res. like for like · 61 m away
- 7202 Smokey Hill RdMay 8, 2026Upon inspection of the sewer line three separate root intrusions were identified between the home and the city tap indicating multiple points of failure throughout the system. given the overall condition of the line we recommend a full replacement of the sewer line from the home to the city connection approximately 40 feet in length to provide a long-term solution and prevent recurring issues. our scope of work includes full excavation from the home to the city tap removal of the existing damaged sewer line and installation of new piping for the entire run. this will eliminate all root intrusion points and restore proper flow throughout the system. all new piping will be properly bedded in sand to help prevent ground shifting and ensure long-term stability. upon completion we will perform backfill and restore the work area · 94 m away
- 8507 Bargamin DrSep 29, 2026Addition and remodel extending dinning room and remodel of kitchen · 111 m away
- 7203 Smokey Hill RdSep 27, 2024Replacement of complete existing central heat and air system with or without duct work · 127 m away
- 8419 Red Willow DrJan 25, 2024Replacement of complete existing central heat and air system with or without duct work · 142 m away
- 8501 Selway DrMar 2, 2026Natural gas water heater replacement · 145 m away
- 8408 Red Willow DrJul 31, 2024Replacement of complete existing central heat and air system with or without duct work · 148 m away
- 8406 Red Willow DrDec 5, 2023Express: replace 8 existing windows · 148 m away
- 8410 Red Willow DrAug 27, 2024Replaced 12ft pf broken sewer pipe under slab · 151 m away
- 8412 Red Willow DrDec 29, 2023Replacement of an existing water heater · 159 m away
- 8503 Selway DrJun 4, 2024Replacement of an existing water heater · 161 m away
- 8309 Red Willow DrJan 8, 2025Express: cosmetic remodel changing valves in bathrooms new cabinets in kitchen new countertops new paint light landscaping new doors new flooring servicing hvac · 167 m away