7901 W US 290 Hwy
Austin, TX 78737
Four EV chargers and rooftop auxiliary power at 7901 W US 290
Austin permits filed in December 2023 describe plans for four EV charging stations and a rooftop auxiliary power source at 7901 W US 290 Hwy. The rooftop power permits were marked final on December 11; the EV charger permits were marked expired.
Summarized from City of Austin records · updated Dec 21, 2023
- Projects
- 5
- 5 filings
- Latest filing
- Dec 21, 2023
- since Dec 6, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expired(4) ev charging stations are to be installed in an adjacent landscape island; electrical conduit will be extended from the power poc to each ev charger volta will paint and mark all ev parking stalls and will install necessary parking signs. system voltage - 208v and 480v
- AppliedSep 19, 2023
- IssuedDec 21, 2023
- !WorkDec '23 – Jan '24
- Final inspection
Marked expired Jul 10, 2024.
1 contact on this project · 1 phone number
Permit & project history
5 projects(4) ev charging stations are to be installed in an adjacent landscape island; electrical conduit will be extended from the power poc to each ev charger volta will paint and mark all ev parking stalls and will install necessary parking signs. system voltage - 208v and 480v
(4) ev charging stations are to be installed in an adjacent landscape island; electrical conduit will be extended from the power poc to each ev charger volta will paint and mark all ev parking stalls and will install necessary parking signs. system voltage - 208v and 480v
City of Austin permitElectrical PermitExpired- Record
- 2023-143234 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Rooftop auxiliary power source
Rooftop auxiliary power source
City of Austin permitBuilding PermitFinal- Record
- 2023-148006 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Rooftop auxiliary power source in pec service area
Rooftop auxiliary power source in pec service area
City of Austin permitElectrical PermitFinal- Record
- 2023-148008 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Rooftop auxiliary power source in pec service area ***this permit is for the tie into the main electrical service-hyatt
Rooftop auxiliary power source in pec service area ***this permit is for the tie into the main electrical service-hyatt
City of Austin permitElectrical PermitFinal- Record
- 2023-148006 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
(4) ev charging stations are to be installed in an adjacent landscape island; electrical conduit will be extended from the power poc to each ev charger volta will paint and mark all ev parking stalls and will install necessary parking signs. system voltage - 208v and 480v
(4) ev charging stations are to be installed in an adjacent landscape island; electrical conduit will be extended from the power poc to each ev charger volta will paint and mark all ev parking stalls and will install necessary parking signs. system voltage - 208v and 480v
City of Austin permitBuilding PermitExpired- Record
- 2023-143234 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7901 W US 290 Hwy
What is being built at 7901 W US 290 Hwy?
Austin permit records describe four EV charging stations and a rooftop auxiliary power source. The filings do not describe a new building.
Are EV chargers planned for 7901 W US 290?
Yes. Permits 2023-143234 EP and 2023-143234 BP describe four EV charging stations, with electrical service, marked parking stalls and signs. Both permits were marked expired.
When were the permits filed for the EV chargers at 7901 W US 290?
The building permit, 2023-143234 BP, was filed December 6, 2023, and the electrical permit, 2023-143234 EP, was filed December 21, 2023. Both are listed as expired.
What is the rooftop auxiliary power project at 7901 W US 290?
Building permit 2023-148006 BP and electrical permits 2023-148008 EP and 2023-148006 EP describe a rooftop auxiliary power source. The records say the permits were final on December 11, 2023.
What is the status of the permits at 7901 W US 290?
The three permits for the rooftop auxiliary power source are listed as final. The two permits for the EV charging stations are listed as expired.