11624 Via Grande Dr
Austin, TX 78739
Window, door and EV charger work at 11624 Via Grande Dr
City of Austin permits indicate replacement of 30 windows and one door at this residence, with no structural changes. The window and door permit was filed August 31, 2026; an electrical permit for a Level 2 EV charger was filed September 3, 2025.
Summarized from City of Austin records · updated Aug 31, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Aug 31, 2026
- since Sep 3, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayExpress- remove and replace 30 windows and 1 door like for like no structural changes
- AppliedAug 27, 2026
- IssuedAug 31, 2026
- WorkAug '26 – Feb '27
- Final inspection
2 contacts on this project · 2 phone numbers
Permit & project history
3 projectsExpress- remove and replace 30 windows and 1 door like for like no structural changes
Express- remove and replace 30 windows and 1 door like for like no structural changes
City of Austin permitBuilding PermitActive- Record
- 2026-112464 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2025-111035 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Tunnel under the foundation and repair sewer line
Tunnel under the foundation and repair sewer line
City of Austin permitPlumbing PermitFinal- Record
- 2023-137530 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11624 Via Grande Dr
What work is permitted at 11624 Via Grande Dr in Austin?
Permits cover replacing 30 windows and one door like for like, with no structural changes, and installing a Level 2 EV charger.
When was the window and door permit filed at 11624 Via Grande Dr?
The City of Austin filed permit 2026-112464 BP on August 31, 2026.
Is a new house being built at 11624 Via Grande Dr?
The listed permits describe home improvements, not new construction: window and door replacement and a Level 2 EV charger installation.
Is an EV charger being installed at 11624 Via Grande Dr?
Yes. Electrical permit 2025-111035 EP covers a Level 2 EV charger and was filed September 3, 2025. Its status is Final.
How many windows are being replaced at 11624 Via Grande Dr?
The August 31, 2026 permit describes replacing 30 windows and one door like for like, with no structural changes.
Also being built nearby
All of 78739- 11616 Via Grande DrDec 27, 2023Replacement of an existing water heater 50-gal gas · 44 m away
- 11612 Via Grande DrMay 9, 2026Replacement of complete existing central heat and air system with or without duct work · 67 m away
- 11712 Via Grande DrAug 6, 2024Replacement of an existing water heater · 86 m away
- 8100 Tierra Linda LnJun 10, 2025Replace existing water heater with tankless water heater in garage · 102 m away
- 8013 Ladera Verde DrOct 2, 2026Replacement of complete existing central heat and air system with or without duct work install 4 ton 17 seer gas system · 112 m away
- 8008 Pamplona Vista CvMar 3, 2026Express: replace 24 windows (like for like) · 120 m away
- 7916 Bettis Trophy DrJun 2, 2026Replace the malfunctioning rivian ev charger with the new unit shipped to the customer by rivian. replacement should be like for like in the same location and at the same amperage as the original unit and involve no additional work. take the defective unit with you on completion packaged in the replacement chargers box and return it using the prepaid label mails to you by treehouse · 135 m away
- 11521 Via Grande DrApr 10, 2024Replacement of complete existing central heat and air system with or without duct work · 138 m away
- 7913 Bettis Trophy DrAug 7, 2024Installing gas for a generator. will tap from meter to generator. less then 10ft i will be using 11/4 line to support generator · 148 m away
- 11517 Via Grande DrMar 5, 2026Replacement of complete existing central heat and air system with or without duct work · 154 m away
- 11801 Via Grande DrAug 25, 2026Install level 2 ev charger · 158 m away
- 8000 Ladera Verde DrSep 9, 2024Shutdown required for installation of tesla gateway v3 transfer switch. no meter work being performed. underground service. pec utility · 164 m away