11820 Quintana Cv

Austin, TX 78739

Garage EV charger and outlet wiring permitted in Austin

A City of Austin electrical permit filed March 13, 2026, covers a dedicated 50-amp circuit and installation of a customer-provided EV charger in the garage at 11820 Quintana Cv. The work also includes a 20-amp garage outlet circuit and three junction boxes with receptacles; the permit is marked final.

Summarized from City of Austin records · updated Mar 13, 2026

Projects
1
1 filings
Latest filing
Mar 13, 2026
since Mar 13, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

In garage- 1). install new dedicated 50 amp 4 wire circuit up to 15 through studs to designated location. install new 2 pole 50 amp breaker and customer provided ev charger. 2). install new dedicated 20 amp 120 volt circuit for garage plug power. install 3 new junction boxes with 20 amp tr plugs one of which will be a gfci tr/wr plug to protect second and third plug. strap all wiring accordingly

  1. AppliedMar 13, 2026
  2. IssuedMar 13, 2026
  3. WorkMar '26 – Mar '26
  4. Final inspectionMar 27, 2026

Passed final inspection Mar 27, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. In garage- 1). install new dedicated 50 amp 4 wire circuit up to 15 through studs to designated location. install new 2 pole 50 amp breaker and customer provided ev charger. 2). install new dedicated 20 amp 120 volt circuit for garage plug power. install 3 new junction boxes with 20 amp tr plugs one of which will be a gfci tr/wr plug to protect second and third plug. strap all wiring accordingly

    In garage- 1). install new dedicated 50 amp 4 wire circuit up to 15 through studs to designated location. install new 2 pole 50 amp breaker and customer provided ev charger. 2). install new dedicated 20 amp 120 volt circuit for garage plug power. install 3 new junction boxes with 20 amp tr plugs one of which will be a gfci tr/wr plug to protect second and third plug. strap all wiring accordingly

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 11820 Quintana Cv

What is being installed at 11820 Quintana Cv?

A City of Austin permit covers a garage EV charger, a dedicated 50-amp circuit, and a 20-amp circuit for garage outlets. The work also includes three junction boxes with receptacles.

Is an EV charger being installed at 11820 Quintana Cv?

Yes. Permit 2026-030953 EP describes installing a customer-provided EV charger in the garage with a new dedicated 50-amp circuit.

When was the electrical work permitted at 11820 Quintana Cv?

The City of Austin filed electrical permit 2026-030953 EP on March 13, 2026.

What does permit 2026-030953 EP cover?

The permit covers a garage EV charger and its dedicated 50-amp circuit, plus a 20-amp circuit for garage outlets and three junction boxes with receptacles.

Is the permit for 11820 Quintana Cv final?

Yes. The City of Austin record for permit 2026-030953 EP lists its status as final.