groundranger
Recent · latest filing Aug 2026Residential

12509 Alcanza Dr

Austin, TX 78739

Drain-line tunnel repair permitted at 12509 Alcanza Dr

A City of Austin permit filed August 11, 2026, covers excavating three tunnels under the house to repair the main drain line. An earlier permit, filed July 2, 2025, covered replacement of the existing central heating and air system and is marked final.

Summarized from City of Austin records · updated Aug 11, 2026

Projects
2
2 filings
Latest filing
Aug 11, 2026
since Jul 2, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Excavate 3 tunnel to repair main drain line under house

  1. AppliedAug 4, 2026
  2. IssuedAug 11, 2026
  3. WorkAug '26 – Feb '27
  4. Final inspection
55% through of the permit windowAug 11, 2026 → Feb 10, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Excavate 3 tunnel to repair main drain line under house

    Excavate 3 tunnel to repair main drain line under house

    City of Austin permitPlumbing PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 12509 Alcanza Dr

What work is happening at 12509 Alcanza Dr in Austin?

A City of Austin permit covers excavating three tunnels under the house to repair the main drain line. The permit, 2026-100755 PP, was filed August 11, 2026.

Is a new home being built at 12509 Alcanza Dr?

The records provided show repair and mechanical-system work, not a new-home construction permit.

When was the drain-line repair permit filed at 12509 Alcanza Dr?

The City of Austin filed permit 2026-100755 PP on August 11, 2026. Its description says three tunnels will be excavated under the house to repair the main drain line.

What was the earlier permit for at 12509 Alcanza Dr?

Permit 2025-080768 MP, filed July 2, 2025, covered replacement of the existing central heat and air system, with or without duct work. Its status is final.

Are there permits for other work at 12509 Alcanza Dr?

The records list two permits: the August 2026 drain-line repair and the July 2025 central heat and air system replacement.

Also being built nearby

All of 78739
Email me when it passes final inspection