3700 Convict Hill Road
Austin, TX 78739 · Austin Independent School District
Covington Middle School bleachers to be replaced
A project at Covington Middle School will replace the existing bleachers with bleachers of the same size in the same location. The project was registered with the Texas Department of Licensing and Regulation on September 17, 2026, under project number TABS2027001316.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 17, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 17, 2026
- since Sep 17, 2026
- Largest scope
- 3,096 sf
- Estimated cost
- $84K
- state registration
Where this project stands
Approved · construction starts Dec 1, 2026Covington MS 2022 Bond Improvement
3,096 sq ft · $84K est.
- RegisteredSep 17, 2026
- Plan review
- ConstructionDec '26 – Mar '27
- Inspected
- Closed
A 3-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReplacement of existing bleachers with same size, and in same location. — covington middle school
TDLR project registrationRenovation/AlterationReview Complete3,096 sq ft$84K est.- Project #
- TABS2027001316
- Tenant / owner
- Covington Ms 2022 Bond Improvement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3700 Convict Hill Road
What is being built at 3700 Convict Hill Road?
The project is a replacement of Covington Middle School’s existing bleachers with bleachers of the same size in the same location. The TDLR registration was filed September 17, 2026.
When was the Covington Middle School bleacher project permitted?
The project was registered with the Texas Department of Licensing and Regulation on September 17, 2026. Its TDLR project number is TABS2027001316.
How much will the Covington Middle School bleacher replacement cost?
The TDLR registration lists an estimated project cost of $84,000. This is the applicant’s estimate for the project.
How large is the Covington Middle School bleacher project?
The TDLR registration lists the project at 3,096 square feet. The description says the replacement bleachers will match the existing bleachers in size and location.
Where is the bleacher replacement project in Austin?
The project is at Covington Middle School, 3700 Convict Hill Road, Austin, TX 78739. The registration identifies it as a renovation or alteration.
Also being built nearby
All of 78739- 3700 Convict Hill Road TX · Austin Independent School DistrictNov 24, 2025Covington ms 2022 bond improvements — renovation/alteration — bond improvements, exterior renovations, re-roofing, mep equipment updates
- 3700 Convict Hill RdNov 4, 2026Per aisd 2022 bond language. secure entry vestibule upgrades storefront and glazing installation. life safety and security improvements. big gym replacement · 54 m away
- 3702 Tamil StMar 28, 2025Sewer line repair in yard · 63 m away
- 3704 Kandy DrOct 22, 2024Express: installing 11 windows like for like · 67 m away
- 3706 Tamil StSep 9, 2024Replacement of complete existing central heat and air system with or without duct work · 92 m away
- 3601 Convict Hill RdJul 2, 2025Remove lift station and dispose · 93 m away
- 3709 Kandy DrMay 5, 2025Request to disconnect - martinez - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 125 main breaker. (upgrading revenue meter to 200 amps.) 6/2/2025 - jd - update - the proposed work on site has changed the existing meter can is to remain. this job is approved for cdp outage on june 2nd 2025 · 100 m away
- 3703 Tamil StJul 17, 2026Replacement water heater · 107 m away
- 3711 Kandy DrMay 2, 2024Excavate and replace 12 tunnel to repair main line in the yard no branches will be dug · 112 m away
- 3707 Tamil StOct 7, 2025Replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas hvac system changeout like for like · 131 m away
- 3521 Convict Hill RdJun 2, 20203521 convict hill day care · 136 m away
- 3712 Tamil StAug 24, 2026Express: upgrade main service panel tub to shower conversion in hall bath · 142 m away