5608 Van Winkle Ln
Austin, TX 78739
5608 Van Winkle Ln: 3 projects on record
City of Austin lists 3 filings across 3 projects at 5608 Van Winkle Ln, Austin, TX 78739 since January 5, 2024. The most recent, filed April 4, 2025, covers: “Tunnel left side of home to expose broken toilet 90 approx 5 in tunneling approx 5 exposing a 3 pvc drain line to a toilet. no sheetrock being removed”.
Compiled from City of Austin records · updated Apr 4, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Apr 4, 2025
- since Jan 5, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel left side of home to expose broken toilet 90 approx 5 in tunneling approx 5 exposing a 3 pvc drain line to a toilet. no sheetrock being removed
- AppliedMar 31, 2025
- IssuedApr 4, 2025
- WorkApr '25 – Apr '25
- Final inspectionApr 18, 2025
Passed final inspection Apr 18, 2025.
1 contact on this project · 1 phone number
Permit & project history
3 projectsTunnel left side of home to expose broken toilet 90 approx 5 in tunneling approx 5 exposing a 3 pvc drain line to a toilet. no sheetrock being removed
Tunnel left side of home to expose broken toilet 90 approx 5 in tunneling approx 5 exposing a 3 pvc drain line to a toilet. no sheetrock being removed
City of Austin permitPlumbing PermitFinal- Record
- 2025-038099 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace sewer line from house to city tap approx 33
Replace sewer line from house to city tap approx 33
City of Austin permitPlumbing PermitFinal- Record
- 2025-009059 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-001402 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5608 Van Winkle Ln
What is being built at 5608 Van Winkle Ln?
The latest filing (City of Austin permit 2025-038099 PP, April 4, 2025) covers tunnel left side of home to expose broken toilet 90 approx 5 in tunneling approx 5 exposing a 3 pvc drain line to a toilet. no sheetrock being removed.
How many permits and filings does 5608 Van Winkle Ln have?
3 filings across 3 projects, from January 5, 2024 to April 4, 2025.
Is there other construction near 5608 Van Winkle Ln?
Yes. Nearby filings include 5616 Van Winkle Ln (express: remove and replace 2 windows: like for like no structural changes, Nov 19, 2024); 5600 Van Winkle Ln (replacement of complete existing central heat and air system with or without duct work, Apr 14, 2025); 5609 Van Winkle Ln (replacement of an existing water heater 40gal gas located in the attic, Jul 9, 2025).
How do I get alerts for new permits at 5608 Van Winkle Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78739- 5616 Van Winkle LnNov 19, 2024Express: remove and replace 2 windows: like for like no structural changes · 51 m away
- 5600 Van Winkle LnApr 14, 2025Replacement of complete existing central heat and air system with or without duct work · 53 m away
- 5609 Van Winkle LnJul 9, 2025Replacement of an existing water heater 40gal gas located in the attic · 56 m away
- 5700 Van Winkle LnFeb 7, 2025Express: window replacement (as needed like for like) · 78 m away
- 5532 Van Winkle LnSep 12, 2024Express: replace windows like for like · 83 m away
- 5704 Van Winkle LnMay 14, 2024Replacement of complete existing central heat and air system with or without duct work · 102 m away
- 5528 Van Winkle LnSep 17, 2026Replace sewer line 70ft [house to city] no foundation work · 103 m away
- 10204 Banks CtJan 21, 2025Install evse · 105 m away
- 10201 Banks CtJan 11, 2024Express: replace windows like for like · 120 m away
- 5511 Van Winkle LnOct 16, 2025Express: remove and replace 33 windows (like for like) · 131 m away
- 5513 Esquel CvJul 31, 2024Replacement of mini-split system · 158 m away
- 10211 Banks CtFeb 17, 2026Replacement of complete existing central heat and air system with or without duct work replacement of existing 2 and 3.5 ton split hvac systems with furnace and associated duct work · 167 m away