groundranger
Recent · latest filing May 2026Residential

5717 Galsworthy Ct

Austin, TX 78739

Master bathroom remodel permitted at 5717 Galsworthy Ct

A non-structural remodel of the existing master bathroom at 5717 Galsworthy Ct was permitted on March 26, 2026. The scope includes replacing fixtures and finishes and converting a standing tub to a walk-in shower; plumbing and electrical permits were filed May 26, 2026, and minor electrical updates may be included.

Summarized from City of Austin records · updated May 26, 2026

Projects
9
9 filings
Latest filing
May 26, 2026
since Nov 14, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Express- non-structural remodel of existing master bathroom. scope includes removal and replacement of existing finishes and plumbing fixtures. work includes converting an existing standing tub to a walk-in shower replacing existing vanity and toilet installation of vanity utilizing existing plumbing connections and removal and replacement of floor and wall tile throughout the bathroom and shower area. minor electrical updates for vanity lighting and bathroom electrical components may be included

  1. AppliedMar 9, 2026
  2. IssuedMay 26, 2026
  3. WorkMay '26 – Aug '26
  4. Final inspectionAug 10, 2026

Passed final inspection Aug 10, 2026.

1 contact on this project · 1 phone number

Permit & project history

9 projects
  1. Express- non-structural remodel of existing master bathroom. scope includes removal and replacement of existing finishes and plumbing fixtures. work includes converting an existing standing tub to a walk-in shower replacing existing vanity and toilet installation of vanity utilizing existing plumbing connections and removal and replacement of floor and wall tile throughout the bathroom and shower area. minor electrical updates for vanity lighting and bathroom electrical components may be included

    Express- non-structural remodel of existing master bathroom. scope includes removal and replacement of existing finishes and plumbing fixtures. work includes converting an existing standing tub to a walk-in shower replacing existing vanity and toilet installation of vanity utilizing existing plumbing connections and removal and replacement of floor and wall tile throughout the bathroom and shower area. minor electrical updates for vanity lighting and bathroom electrical components may be included

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Express- non-structural remodel of existing master bathroom. scope includes removal and replacement of existing finishes and plumbing fixtures. work includes converting an existing standing tub to a walk-in shower replacing existing vanity and toilet installation of vanity utilizing existing plumbing connections and removal and replacement of floor and wall tile throughout the bathroom and shower area. minor electrical updates for vanity lighting and bathroom electrical components may be included

    Express- non-structural remodel of existing master bathroom. scope includes removal and replacement of existing finishes and plumbing fixtures. work includes converting an existing standing tub to a walk-in shower replacing existing vanity and toilet installation of vanity utilizing existing plumbing connections and removal and replacement of floor and wall tile throughout the bathroom and shower area. minor electrical updates for vanity lighting and bathroom electrical components may be included

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Express- non-structural remodel of existing master bathroom. scope includes removal and replacement of existing finishes and plumbing fixtures. work includes converting an existing standing tub to a walk-in shower replacing existing vanity and toilet installation of vanity utilizing existing plumbing connections and removal and replacement of floor and wall tile throughout the bathroom and shower area. minor electrical updates for vanity lighting and bathroom electrical components may be included

    Express- non-structural remodel of existing master bathroom. scope includes removal and replacement of existing finishes and plumbing fixtures. work includes converting an existing standing tub to a walk-in shower replacing existing vanity and toilet installation of vanity utilizing existing plumbing connections and removal and replacement of floor and wall tile throughout the bathroom and shower area. minor electrical updates for vanity lighting and bathroom electrical components may be included

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Express: tub to shower conversion pluming and electrical fixtures replacement like for like re-tiling installing cabinetry countertops

    Express: tub to shower conversion pluming and electrical fixtures replacement like for like re-tiling installing cabinetry countertops

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Express: tub to shower conversion pluming and electrical fixtures replacement like for like re-tiling installing cabinetry countertops

    Express: tub to shower conversion pluming and electrical fixtures replacement like for like re-tiling installing cabinetry countertops

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Express: tub to shower conversion pluming and electrical fixtures replacement like for like re-tiling installing cabinetry countertops

    Express: tub to shower conversion pluming and electrical fixtures replacement like for like re-tiling installing cabinetry countertops

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Express re tilling installing cabinetry countertops. replace existing plumbing and electrical fixtures

    Express re tilling installing cabinetry countertops. replace existing plumbing and electrical fixtures

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Express re tilling installing cabinetry countertops. replace existing plumbing and electrical fixtures

    Express re tilling installing cabinetry countertops. replace existing plumbing and electrical fixtures

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Express re tilling installing cabinetry countertops. replace existing plumbing and electrical fixtures

    Express re tilling installing cabinetry countertops. replace existing plumbing and electrical fixtures

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5717 Galsworthy Ct

What is being built at 5717 Galsworthy Ct?

City of Austin permits indicate a remodel of the existing master bathroom, not a new building. The work includes converting a standing tub to a walk-in shower and replacing bathroom fixtures and finishes.

When was the bathroom remodel at 5717 Galsworthy Ct permitted?

The building permit, 2026-027994 BP, was filed March 26, 2026. Plumbing and electrical permits 2026-027994 PP and 2026-027994 EP were filed May 26, 2026.

Is the tub at 5717 Galsworthy Ct being replaced with a shower?

The permit scope describes converting an existing standing tub to a walk-in shower. It also lists new bathroom fixtures and replacement floor and wall tile.

Is this a structural remodel?

No. The 2026 permit description identifies the work as a non-structural remodel of the existing master bathroom.

What other bathroom work has been permitted at this address?

Earlier City of Austin records include a tub-to-shower conversion and fixture replacement in 2024, under building permit 2024-056756 BP. A 2023 permit also describes retiling, cabinetry and countertop installation, and replacement plumbing and electrical fixtures.

How much will the bathroom remodel cost?

The records provided do not report a project valuation or an applicant estimate for the full project cost.

Also being built nearby

All of 78739
Email me when a new permit is filed