6308 Walebridge Ln
Austin, TX 78739
Central heating and air system replacement permitted
A permit covers replacement of the existing central heating and air system at 6308 Walebridge Ln, with or without ductwork. The City of Austin issued the permit on May 8, 2026; its status is Final.
Summarized from City of Austin records · updated May 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 8, 2026
- since May 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedMay 5, 2026
- IssuedMay 8, 2026
- WorkMay '26 – Nov '26
- Final inspectionNov 2, 2026
Passed final inspection Nov 2, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-056295 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6308 Walebridge Ln
What is being built at 6308 Walebridge Ln?
A City of Austin permit covers replacing the home's existing central heat and air system, with or without ductwork. It does not describe a new building.
When was the HVAC permit filed for 6308 Walebridge Ln?
The permit was filed on May 8, 2026.
What is the permit number for 6308 Walebridge Ln?
The City of Austin permit number is 2026-056295 MP.
Is the heating and air replacement permit at 6308 Walebridge Ln final?
Yes. The permit record lists its status as Final.
Does the permit at 6308 Walebridge Ln include ductwork?
The permit description says the system replacement is with or without ductwork; it does not specify which option applies.
Also being built nearby
All of 78739- 6306 Walebridge LnJan 30, 2026Replacement of an existing water heater install 50gal gas water heater · 23 m away
- 6401 Walebridge LnSep 8, 2025Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 6436 Old Harbor LnJan 11, 2024Replacement of an existing water heater · 58 m away
- 10705 Walebridge CtDec 8, 2023Replacement of an existing water heater · 62 m away
- 6300 Walebridge LnSep 5, 2025Adding exterior main disconnect at my own home. 6300 walebridge lane. i have no outside disconnect so all that i am going to do is install a 200 amp feed through load center outside to feed my garage load center that does not have a main breaker. will install 2 8 ft ground rods · 84 m away
- 6303 Walebridge LnDec 15, 2023Install new irrigation system · 92 m away
- 6442 Old Harbor LnApr 29, 2025Express: replace 9 windows (like for like) · 95 m away
- 6406 Wareham LnJun 24, 2026Express: remove and replace 16 windows (like for like) · 105 m away
- 6444 Old Harbor LnSep 12, 2024Replacement of an existing water heater · 111 m away
- 10700 Walebridge CtJun 16, 2025Replacement of an existing water heater · 116 m away
- 6424 Old Harbor LnMar 14, 2025Replacement of an existing water heater · 120 m away
- 10800 Redgate LnSep 26, 2025Install new 5.525 kw rooftop solar system for existing residential only. pec disconnect/reconnect to upgrade main distribution panel · 135 m away