1304 Summit St

Austin, TX 78741

Sewer and HVAC replacement permits at 1304 Summit St

City of Austin permits indicate a sewage system replacement via a 60-foot tunnel and a central heating and air system replacement for Unit 209 at 1304 Summit St. The HVAC permit was filed February 18, 2026, and the sewer permit was filed May 7, 2026; both are marked final.

Summarized from City of Austin records · updated May 7, 2026

Projects
2
2 filings
Latest filing
May 7, 2026
since Feb 18, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Replace sewage system via tunnel 60ft

    Replace sewage system via tunnel 60ft

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Unit 209 - replacement of complete existing central heat and air system with or without duct work replace the whole system including gas furnace indoor coil outdoor condenser. no ductwork needed to be replaced. also needs run new copper line set to outdoor. will be mounted on the surface of outside wall and covered by metal line set cover

    Unit 209 - replacement of complete existing central heat and air system with or without duct work replace the whole system including gas furnace indoor coil outdoor condenser. no ductwork needed to be replaced. also needs run new copper line set to outdoor. will be mounted on the surface of outside wall and covered by metal line set cover

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1304 Summit St

What work is permitted at 1304 Summit St?

City of Austin records list a central heating and air system replacement for Unit 209 and a sewage system replacement via a 60-foot tunnel.

When were permits filed for 1304 Summit St?

The mechanical permit was filed February 18, 2026, and the plumbing permit was filed May 7, 2026.

What is permit 2026-056714 PP for at 1304 Summit St?

It is a City of Austin plumbing permit for replacing the sewage system via a 60-foot tunnel. The permit was filed May 7, 2026, and is marked final.

What is permit 2026-018886 MP for at 1304 Summit St?

It covers replacement of the complete existing central heating and air system for Unit 209, with no ductwork replacement indicated. The permit was filed February 18, 2026, and is marked final.

Is a new building planned at 1304 Summit St?

The records provided describe sewer and HVAC system replacements, not construction of a new building.