1304 Summit St
Austin, TX 78741
Sewer and HVAC replacement permits at 1304 Summit St
City of Austin permits indicate a sewage system replacement via a 60-foot tunnel and a central heating and air system replacement for Unit 209 at 1304 Summit St. The HVAC permit was filed February 18, 2026, and the sewer permit was filed May 7, 2026; both are marked final.
Summarized from City of Austin records · updated May 7, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 7, 2026
- since Feb 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsReplace sewage system via tunnel 60ft
Replace sewage system via tunnel 60ft
City of Austin permitPlumbing PermitFinal- Record
- 2026-056714 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Unit 209 - replacement of complete existing central heat and air system with or without duct work replace the whole system including gas furnace indoor coil outdoor condenser. no ductwork needed to be replaced. also needs run new copper line set to outdoor. will be mounted on the surface of outside wall and covered by metal line set cover
Unit 209 - replacement of complete existing central heat and air system with or without duct work replace the whole system including gas furnace indoor coil outdoor condenser. no ductwork needed to be replaced. also needs run new copper line set to outdoor. will be mounted on the surface of outside wall and covered by metal line set cover
City of Austin permitMechanical PermitFinal- Record
- 2026-018886 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1304 Summit St
What work is permitted at 1304 Summit St?
City of Austin records list a central heating and air system replacement for Unit 209 and a sewage system replacement via a 60-foot tunnel.
When were permits filed for 1304 Summit St?
The mechanical permit was filed February 18, 2026, and the plumbing permit was filed May 7, 2026.
What is permit 2026-056714 PP for at 1304 Summit St?
It is a City of Austin plumbing permit for replacing the sewage system via a 60-foot tunnel. The permit was filed May 7, 2026, and is marked final.
What is permit 2026-018886 MP for at 1304 Summit St?
It covers replacement of the complete existing central heating and air system for Unit 209, with no ductwork replacement indicated. The permit was filed February 18, 2026, and is marked final.
Is a new building planned at 1304 Summit St?
The records provided describe sewer and HVAC system replacements, not construction of a new building.
Also being built nearby
All of 78741- 1300 Summit StApr 30, 2025Gas line install ** for generator · 58 m away
- 1505 Sunny Vale StFeb 26, 2024Replace one existing window- like for like (historic approved) · 65 m away
- 1402 Summit StAug 14, 2024New irrigation system installation · 65 m away
- 1503 Lupine LnJul 1, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 94 m away
- 1604 Sunny Vale StSep 28, 2026Replacement of an existing water heater remove existing water heater in garage and install new 50 gallon natural gas water heater in garage · 118 m away
- 1605 Lupine LnNov 12, 202455 tunnel below the foundation to replace entire cast-iron drain system. 2 access holes - 1 front 1 back · 119 m away
- 1500 Summit StAug 14, 2026Replacement of complete existing central heat and air system with or without duct work · 147 m away
- 1221 IH 35 SvrdNov 11, 20261221 s ih-35 rezoning · 151 m away
- 1509 Inglewood StAug 18, 2026Base: installing a backup battery system and additional meter socket · 155 m away
- 1606 Elmhurst DrApr 23, 2025Express: guest bathroom remodel no layout change update exhaust fan new recessed lights · 163 m away
- 1609 Sunny Vale StJan 11, 2024Emergency sewer yard line replacement · 165 m away
- 1505 Summit StJul 23, 2025Install level 2 ev charger · 181 m away